PLUMBING CODE-PREBOARD 1-49 (Mockup)

PLUMBING CODE-PREBOARD 1-49 (Mockup)

Professional Development

49 Qs

quiz-placeholder

Similar activities

NC Test Prep Unit III - Prop Charac, Legal Descript Prop Use (N)

NC Test Prep Unit III - Prop Charac, Legal Descript Prop Use (N)

Professional Development

50 Qs

ACE-3

ACE-3

Professional Development

50 Qs

PDE-2022-3

PDE-2022-3

Professional Development

50 Qs

Quality Engineering - Online Assessment

Quality Engineering - Online Assessment

Professional Development

45 Qs

MET Pre-Placement Aptitude Test

MET Pre-Placement Aptitude Test

Professional Development

46 Qs

Human Resource Management Final Exam

Human Resource Management Final Exam

Professional Development

50 Qs

Sec+ 601 Final Review Week

Sec+ 601 Final Review Week

Professional Development

52 Qs

Water Supply Final Prep 1

Water Supply Final Prep 1

Professional Development

50 Qs

PLUMBING CODE-PREBOARD 1-49 (Mockup)

PLUMBING CODE-PREBOARD 1-49 (Mockup)

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

J Lang

FREE Resource

49 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is inserted into the water main and it serves as the control of the water service?

Curb stop

Corporation stop

Water stop

Meter stop

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before Martial Law, Republic Act No. 6541 known as the?

Building Code of the Philippines

Fire Code of the Philippines

Sanitation Code of the Philippines

Plumbing Code of the Philippines

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In case of renewal of plumbing permit, a fee equivalent to how much shall be paid.

20% of the original fee

40% of the original fee

30% of the original fee

50% of the original fee

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Actuated by stem screw, and hand wheel, suited on installation that calls for throttling?

Foot valve

Gate valve

Angle valve

Globe valve

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PVC pipe may be threaded only if it is schedule or heavier.

20

40

60

80

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Aside from the number of fixture units connected to it, the size of the vent piping is determined by its

discharge

number of inlets

loading

length

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In what year, NAMPAP President Jaime M. Cabase spearhead the updating of the Revised National Plumbing Code?

1999

2003

1980

1996

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development