Construction Project Planning Quiz

Construction Project Planning Quiz

12th Grade

77 Qs

quiz-placeholder

Similar activities

Quiz 4

Quiz 4

9th - 12th Grade

78 Qs

ESRI Drone 2 Map  Part 1A Practice (SLIDES 1-30)

ESRI Drone 2 Map Part 1A Practice (SLIDES 1-30)

9th - 12th Grade

82 Qs

ASVAB Practice Test from Arkansas Rehabilitation Services

ASVAB Practice Test from Arkansas Rehabilitation Services

11th - 12th Grade

75 Qs

Driver Ed. Unit 1 Quizizz

Driver Ed. Unit 1 Quizizz

10th - 12th Grade

75 Qs

ENTREPRENEURSHIP

ENTREPRENEURSHIP

12th Grade

80 Qs

Try Out IPA, MTK, BIN, BING

Try Out IPA, MTK, BIN, BING

9th Grade - University

80 Qs

Nervous System

Nervous System

12th Grade

78 Qs

Horticulture Final Exam Review

Horticulture Final Exam Review

9th - 12th Grade

75 Qs

Construction Project Planning Quiz

Construction Project Planning Quiz

Assessment

Quiz

Other

12th Grade

Hard

Created by

Miles Tarplee

Used 2+ times

FREE Resource

77 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of project planning before construction work begins?

To ensure the work is completed to the clients' requirements and within the timescale and budgets agreed.

To hire the necessary construction personnel.

To finalize the construction design.

To purchase all required materials.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT mentioned as a part of planning for construction or building services projects?

Writing Programmes Of Work.

Method statements and risk assessments.

Planning site layouts.

Selecting the final paint colors for the interior.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the 6 Ps stand for in the context of project planning?

Proper Planning and Preparation Prevents Poor Performance.

Professional Planning and Process Promotes Peak Performance.

Precise Planning and Preparation Produces Perfect Performance.

Proactive Planning and Prioritization Prevents Problems.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does site analysis involve before formulating any design according to the learning material?

Evaluating the economic potential of the site

Conducting soil tests for agricultural suitability

Surveying the land and measuring its features such as levels

Assessing the site for potential archaeological findings

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a term of site analysis mentioned in the learning material?

Size

Location

Topography

Climate conditions

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is included in the current and proposed characteristics of a site during the analysis?

Nearby water bodies and marine life

Existing buildings, trees, other structures

Traffic patterns and public transportation

Soil pH levels and mineral content

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of outline planning in the context of building construction?

To submit the final building design for approval

To provide a brief description and drawings showing the planned position size, layout, and intended use

To commission architects to produce full drawings and other details

To apply for the necessary funds to start construction

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?