PHASE 2 END TEST NO 1

PHASE 2 END TEST NO 1

Professional Development

50 Qs

quiz-placeholder

Similar activities

CCNA 2 MOD 5-6

CCNA 2 MOD 5-6

Professional Development

53 Qs

141 mid term review/ final part 1

141 mid term review/ final part 1

Professional Development

47 Qs

GMC PC1250-8

GMC PC1250-8

Professional Development

50 Qs

Plumbing

Plumbing

Professional Development

48 Qs

PT grader 825

PT grader 825

Professional Development

50 Qs

POST TEST MTS WA600-3 INDE

POST TEST MTS WA600-3 INDE

Professional Development

50 Qs

FIRE SUPPRESSION

FIRE SUPPRESSION

Professional Development

48 Qs

PRODUCT TRAINING WA500-3

PRODUCT TRAINING WA500-3

Professional Development

50 Qs

PHASE 2 END TEST NO 1

PHASE 2 END TEST NO 1

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

colin Nash

Used 9+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is the maximum distance between the open vent and cold feed on an H-frame?

100m

150m

100mm

150mm

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is the most suitable position for the installation of an expansion vessel within a central heating system?

On the flow pipe near to the boiler

On the cold feed pipe to the system

On the return pipe near to the boiler

On the open vent pipe

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

An S-plan system has what type of valve controlling the hot water and central heating circuits?

2 x 3 port valves

 1 x 2 port valves.

1 x 3 port valves.

 2 x 2 port valves.

4.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

When the zone valve closes, the boiler switches off and the circulator stops running, but the programmer is still on; this is known as…

This is known as thermos interlock

This is known as system interlock

This is known as boiler interlock

This is known as boiler unlock

5.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

An S-plan system has what type of valve controlling the hot water and central heating circuits?

1 x 3 port valves

2 x 2 port valves

2 x 3 port valves

1 x 2 port valves

6.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Which British Standard offers advice on the filling and testing of central heating systems?

BSEN 12556

BSEN 14336

BSEN 6700

BSEN 806

7.

MULTIPLE SELECT QUESTION

3 mins • 1 pt

which criteria you think may affect the design of a central heating system?

customer’s needs

building layout and features

environmental impact

legislation and guidance

suitability of system

energy efficiency

occupancy type

cost

storage requirements 

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?