
Site preparation unit 005
Special Education
Professional Development
Used 143+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the phrase used for when plumbers start work and notch out and drill joist and put pipes under floors
Pre-plumbing
First fixing
Second fixing
Phase 1
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following parts of the Building Regulations deals with building structural strength
Part G
Part C
Part E
Part A
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When drilling or notching floor joist for pipework what building regulation needs to be consulted and followed
Building regulation part D
Building regulation part A
Building regulation part L
Building regulation part C
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. Which one of the following is the correct vertical clipping interval for 15 mm copper tube?
1200mm
80mm
1000mm
1.8m
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of screw head is this
Plussie
Pozziedrive
Philips
Crosshead
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. Which one of the following grades of copper is not suitable for bending?
R290
R300
R220
R250
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are these spanners used for
Changing an immersion heater
Tightening up LCS threaded fittings
Tightening and undoing taps on basins, sinks and baths
Tightening compression pipe fittings
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?