D60 QUIZ OF THE DAY

D60 QUIZ OF THE DAY

Professional Development

30 Qs

quiz-placeholder

Similar activities

January In-Service Quiz

January In-Service Quiz

Professional Development

25 Qs

Quiz Validation-Qualification

Quiz Validation-Qualification

Professional Development

25 Qs

Environmental

Environmental

Professional Development

25 Qs

Plumbing Quiz 1

Plumbing Quiz 1

KG - Professional Development

30 Qs

D85ESS-2_Product Knowledge

D85ESS-2_Product Knowledge

Professional Development

25 Qs

MCM RESIDENTS LONG QUIZ JUNE 2021

MCM RESIDENTS LONG QUIZ JUNE 2021

Professional Development

30 Qs

Cardiovascular System

Cardiovascular System

Professional Development

28 Qs

Irrigation

Irrigation

Professional Development

26 Qs

D60 QUIZ OF THE DAY

D60 QUIZ OF THE DAY

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

WINCENTRE CLASSES

Used 1+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the typical detention period for a septic tank?
6-12 hours
24–48 hours
48–72 hours
12–24 hours

Answer explanation

The typical detention period in septic tanks is between 24 to 48 hours.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the minimum width of a septic tank?
50 cm
75 cm
100 cm
125 cm

Answer explanation

The minimum width of a septic tank is 75 cm as per standards.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which material is used for the ventilating pipe in septic tanks?
PVC
Cast iron
Steel
Aluminium

Answer explanation

Cast iron or asbestos is commonly used for ventilating pipes.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the purpose of a baffle wall in a septic tank?
Aesthetic design
To allow light inside
Enhance scum thickness
Control scum and sludge movement

Answer explanation

Baffle walls help in controlling the movement of scum and sludge.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the minimum capacity of a septic tank?
0.5 cubic metre
1 cubic metre
2 cubic metres
3 cubic metres

Answer explanation

Minimum septic tank capacity recommended is 1 cubic metre.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The average sewage flow considered per capita per day for septic tank design is:
25 litres
45 litres
90 litres
120 litres

Answer explanation

The average sewage flow is considered 45 L per capita/day.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the typical cleaning period for septic tanks?
3–6 months
6–12 months
12–24 months
1–2 years

Answer explanation

Tanks are cleaned every 6 to 12 months depending on usage.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?