Quality, Risk, D&B vs Traditional

Quality, Risk, D&B vs Traditional

University

8 Qs

quiz-placeholder

Similar activities

Week 21 - Quiz 3 - Earthquake Legislation

Week 21 - Quiz 3 - Earthquake Legislation

University

5 Qs

Project Planning

Project Planning

University

10 Qs

Construction Technology Test Week 1-6

Construction Technology Test Week 1-6

University

10 Qs

UNIT 109 PPT 3 KNOWLEDGE CHECK AND STARTER.

UNIT 109 PPT 3 KNOWLEDGE CHECK AND STARTER.

12th Grade - University

11 Qs

Primary and Secondary Processes Quiz

Primary and Secondary Processes Quiz

9th Grade - University

10 Qs

Roles of QS at Pre and Post Contract Stage

Roles of QS at Pre and Post Contract Stage

University

10 Qs

Construction Management Principles

Construction Management Principles

University

7 Qs

PPT 2 KNOWLEGDE CHECKER AND STARTER

PPT 2 KNOWLEGDE CHECKER AND STARTER

12th Grade - University

13 Qs

Quality, Risk, D&B vs Traditional

Quality, Risk, D&B vs Traditional

Assessment

Quiz

Construction

University

Hard

Created by

Emma Coyle

Used 1+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary function of a Risk Management Plan?

To identify, assess, and manage project risks

To eliminate all project risks

To track contractor work progress

To monitor financial transactions

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is a key disadvantage of relying solely on Quality Control (QC) in construction?

It prevents all defects from occurring

It eliminates the need for inspections

It focuses on detecting and fixing defects rather than preventing them

It makes Quality Assurance (QA) unnecessary

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The safety and health plan is a document that includes information to allow for the safe planning and execution of the construction phase. Over how many stages is the plan developed?

1

2

3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Quality Assurance is

an approach to managing poor workplace attitudes

a project management strategy to assure project success

implementing processes to prevent defects occurring

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of a Safety File in construction projects?

To document financial transactions related to safety investments

To record all accidents and incidents that occurred on site

To provide a step-by-step guide for securing a construction permit

To record health and safety information for the future operation, maintenance, and demolition of a structure

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

RAMS stands for Risk Assessment and

Regulatory and Management Standards

Roadwork and Material Safety

Resource Allocation and Maintenance Strategy

Risk Assessment and Method Statement

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a Traditional procurement mechanism, the Contractor has ownership over the design process

True

False

8.

MULTIPLE SELECT QUESTION

1 min • 1 pt

Select all "true" statements as they relate to D&B style contract compared to a Traditional Contract

Improved Collaboration between designers and contractors

Single -point of contact for all the works and a single contract with the Client on a D&B

Contractors prefer Traditional Contracts over D&Bs

The Contractor can use their expertise to contribute to design decisions and improve health and safety / cost

The Client holds more Design Risk in a D&B than a Traditional contract