A7: Air Operator Certificate Requirements

A7: Air Operator Certificate Requirements

9th - 12th Grade

54 Qs

quiz-placeholder

Similar activities

GAMBAR TEKNIK

GAMBAR TEKNIK

10th Grade

50 Qs

Foundations of Engineering Final Spring 2025

Foundations of Engineering Final Spring 2025

9th - 12th Grade

50 Qs

DC Circuits Webxam Refresh

DC Circuits Webxam Refresh

10th Grade

57 Qs

Logic Gates and Boolean Functions Quiz

Logic Gates and Boolean Functions Quiz

12th Grade

50 Qs

A1.4: Singapore Airworthiness Requirements (pt. 2)

A1.4: Singapore Airworthiness Requirements (pt. 2)

9th - 12th Grade

51 Qs

8.2.1 - Mechanical Power Systems

8.2.1 - Mechanical Power Systems

10th Grade - University

54 Qs

Uji Kejuruan XII Airframe Power Plant

Uji Kejuruan XII Airframe Power Plant

12th Grade

55 Qs

A7: Air Operator Certificate Requirements

A7: Air Operator Certificate Requirements

Assessment

Quiz

Engineering

9th - 12th Grade

Easy

Created by

Haziq Abdullah

Used 8+ times

FREE Resource

54 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The AOCR stands for ________.

Air Operator Certificate Requirements

Air Operator Certified Requirements

Airworthiness Operators Certificate Requirements

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An applicant for an Air Operator Certificate should contact the Authority at least ________ months before the anticipated start of operations.

three

six

twelve

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Authority has adopted a ________ process for systematic and timely handling of all AOC applications.

4-phase

5-phase

6-phase

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At the pre-application discussion phase, an application form _________ is issued when the applicant desires to continue with the AOC application.

CAAS(AW)66

CAAS(AW)67

CAAS(AW)68

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The formal application phase for an AOC shall commence at least _____ months before the desired start of revenue operations.

five

six

seven

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Authority will arrange a formal meeting with the AOC applicant’s management team after the applicant has submitted the required information and attachments at the ________ phase.

pre-application discussion phase

formal application phase

document evaluation phase

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Authority will begin a thorough evaluation of all manuals, documents and attachments to ensure that all documents meet standards and requirements at the ________ of the AOC application.

pre-application discussion phase

formal application phase

document evaluation phase

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?