DQS252 -BASEMENT OVERALL

DQS252 -BASEMENT OVERALL

1st Grade

10 Qs

quiz-placeholder

Similar activities

AstroClub

AstroClub

1st - 3rd Grade

9 Qs

DJP40043-CHAPTER 1 (PAPER)

DJP40043-CHAPTER 1 (PAPER)

1st - 3rd Grade

10 Qs

Theories of Learning Week 4 | Test Your Knowledge

Theories of Learning Week 4 | Test Your Knowledge

KG - University

10 Qs

Bacteria and Viruses

Bacteria and Viruses

KG - 12th Grade

6 Qs

Black History Month (Maya + Jackie)

Black History Month (Maya + Jackie)

1st - 2nd Grade

13 Qs

REVIEW 3.3

REVIEW 3.3

1st Grade - University

6 Qs

Rhyming Odd 1 Out

Rhyming Odd 1 Out

KG - 1st Grade

12 Qs

Kuis Guru SDN Wringinjajar 3

Kuis Guru SDN Wringinjajar 3

1st - 5th Grade

10 Qs

DQS252 -BASEMENT OVERALL

DQS252 -BASEMENT OVERALL

Assessment

Quiz

Education

1st Grade

Hard

Created by

ANISAH ABDULLAH

Used 6+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The advantage of ___________ is the basement windows are all above grade.

daylight basement

look-out basement

cellar

crawl space

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Composite techniques is a mixture of top down and bottom up construction methods.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________ and lagging walls are the most inexpensive systems compared to other retaining walls.

Steel sheet pile

Secant pile wall

Soldier pile

Diaphragm wall

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

___________ consist of a row of pile which interlock with one another to form a continuous wall either temporary or permanent.

Diaphragm wall

Soldier pile

Steel pile

Sheet pile wall

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The term ‘basement’ has been regarded as to the term ‘deep pit’, which applies to excavations over 5-6.5 m deep.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

___________ may not require an additional support operations and equipment because of the construction of the slope of the bank provide stability.

Open cut arrangement

Cut and cover arrangement

Top down arrangement

Bottom-up arrangement

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_______ is constructed by excavation in a trench which is temporarily using the slurry trench technique.

Secant pile wal

Contiguous bore piles wall

Diaphragm wall

Sheet pile wall

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?