Chapter 5: Inspection and Test
Authored by Maria Fandiño
Other
Professional Development
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
8 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
This is the type of test where the system shall be plugged at its point of connection with public sewer or private sewage disposal and completely filling it with water from the lowest to highest point. Equivalent low pressure air test may also be done as an alternative.
Building Sewer Test
Water Piping Test
Air Test
Water Test
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Atleast how many working days before the inspection date should the advance notice be given?
1
2
3
4
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Drainage and vent system can be tested using water provided a ________.
3 meters head of water for 15 minutes
4 meters head of water for 15 minutes
19.62 kPa for 15 minutes
2 meters for 15 minutes
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Air test
34.5 kPa for at least 15 minutes
30.5 kPa for at least 15 minutes
33.5 kPa for at least 15 minutes
34.5 kPa for at least 10 minutes
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Water piping should be tested under a water pressure of __________.
100%
150%
200%
50%
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Water piping may be tested by air as a substitute for water test under _______.
344.5 kPa for 15 mins
325 kPa for 15 mins.
400 kPa for 15 mins.
34.5 kPa for 15 mins.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Plumbing, drainage and vent system shall be tested with the use of water or air
media
true
covering or use
water test
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?