POB1-Sources of information used in construction

POB1-Sources of information used in construction

Professional Development

27 Qs

quiz-placeholder

Similar activities

HRDirect Quiz - Auditoria

HRDirect Quiz - Auditoria

Professional Development

26 Qs

Entrepreneurship In Education

Entrepreneurship In Education

Professional Development

25 Qs

level 3 revision set 1

level 3 revision set 1

Professional Development

30 Qs

Trivia

Trivia

KG - Professional Development

23 Qs

Copyright Quiz

Copyright Quiz

8th Grade - Professional Development

24 Qs

Google Certified Educator Level 2 Quiz part1

Google Certified Educator Level 2 Quiz part1

Professional Development

23 Qs

Paraeducator Vocabulary

Paraeducator Vocabulary

Professional Development

25 Qs

Present Simple and Present Continuous

Present Simple and Present Continuous

Professional Development

25 Qs

POB1-Sources of information used in construction

POB1-Sources of information used in construction

Assessment

Quiz

Education

Professional Development

Medium

Created by

Alexandru Pavel

Used 38+ times

FREE Resource

27 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Many different sources of information are used in the construction industry to make sure that things are built accurately, safely and according to :

Council Regulations

Building Regulations.

Local Planning Regulations

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The sources of information used in construction are as follows:

Drawings and Building Regulations

Specifications and Schedules

Programme of Work

Construction Magazine Daily

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Technical drawing need to meet the criteria set out by :

British Standards

Building Regulations

HSE

Local Council

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Technical drawings are done by:

Engineers

Designers

Architects

Labourers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The primary work completed in a building before the walls and ceilings are plastered, such as installing windows, door frames and stairs is called:

Second Fix

First Fix

Addendum

Third Fix

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Carpentry work completed after the walls and ceilings have been plastered, such as installing skirting, architraves and doors is called:

First Fix

Second Fix

Addendum

Third Fix

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

True or False: Working drawings are referred to when calculating costs and the quantity of materials required for producing work.

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?