ENTREP: Lesson 5

ENTREP: Lesson 5

Professional Development

29 Qs

quiz-placeholder

Similar activities

Quiz_Course3

Quiz_Course3

Professional Development

25 Qs

REPASO 230505

REPASO 230505

Professional Development

32 Qs

Instruments and Measurements Quiz

Instruments and Measurements Quiz

Professional Development

24 Qs

CS Module 3

CS Module 3

Professional Development

25 Qs

Bible Study Grade 3

Bible Study Grade 3

Professional Development

30 Qs

Pharmacy Settings, Professions, Roles & Responsibilities

Pharmacy Settings, Professions, Roles & Responsibilities

12th Grade - Professional Development

30 Qs

Low-Voltage Hand Tools Safety Quiz LO 1.5 elec

Low-Voltage Hand Tools Safety Quiz LO 1.5 elec

Professional Development

24 Qs

ENTREP: Lesson 5

ENTREP: Lesson 5

Assessment

Quiz

Education

Professional Development

Easy

Created by

Christian Kyle

Used 6+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

29 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This plan should indicate how the different stages in a process are linked together.

Product Planning

Raw Materials and Ingredients

Equipment Required

Packaging

Staffing Levels

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It should identify any 'bottlenecks in the process, the equipment that is required for each stage and where quality assurance procedures should be used.

Product Planning

Raw Materials and Ingredients

Equipment Required

Packaging

Staffing Levels

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The data that has been found from market surveys is added to the process chart to indicate the scale of production that is required.

Product Planning

Raw Materials and Ingredients

Equipment Required

Packaging

Staffing Levels

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A chart is prepared and used for planning a number of different aspects of the production process.

Product Planning

Raw Materials and Ingredients

Equipment Required

Packaging

Staffing Levels

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

There are two stages involved in planning the amounts of materials that are needed to produce the required weight of product. 

Product Planning

Raw Materials and Ingredients

Equipment Required

Packaging

Staffing Levels

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is necessary to calculate the amount of each ingredient that will be needed to formulate a batch of product. 

Product Planning

Raw Materials and Ingredients

Equipment Required

Packaging

Staffing Levels

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Further, it is necessary to calculate the amount of losses that can be expected during preparation.

Product Planning

Raw Materials and Ingredients

Equipment Required

Packaging

Staffing Levels

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?