1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the Progressive Demolition?
•Removal the key structural members to cause complete collapse of the whole structure
•Commonly known as top – down demolition
•removal of selected parts of the structure by dismantling or deconstruction.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Examples of Deliberate Collapse Mechanisms are
Hand Demolition
Explosive
Wrecking Ball
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Examples of Progressive Demolition are below EXCEPT
Pusher Arm
Wrecking Ball
Wire Rope Pulling
Hand Demolition
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The PRE DEMOLITION PHASES are as below
Site survey - Site Preparation - Soft Stripping - Recycling & Reuse
Site Preparation - Soft Stripping - Recycling & Reuse
Site survey - Site Preparation - Recycling & Reuse - Soft Stripping
Site survey - Recycling & Reuse - Soft Stripping
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A demolition is to be used for 1-storey Shoplot.
Proposed the best method that is most suitable for this project
Wrecking Ball
Hand Demolition
Pusher Arm
Explosion
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
20-Storey High Building is to be demolished.
The site has no adequate access.
Proposed the best method for this activity.
Explosion
Wire Rope
Wrecking Ball
Hand Demolition
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A 5-storey Building is to be demolished.
Adequate access is available.
What is the most economical method to be used?
Explosive
Wrecking Ball
Wire Rope
Pusher Arm
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?