Demolition Works

Demolition Works

University

8 Qs

quiz-placeholder

Similar activities

Module 1_Town Planning

Module 1_Town Planning

University

11 Qs

STAGES OF CONSTRUCTION

STAGES OF CONSTRUCTION

University

13 Qs

Architectural Design V

Architectural Design V

University

11 Qs

General Principles of Planning

General Principles of Planning

University

10 Qs

Architectural drawing basics

Architectural drawing basics

University

10 Qs

Loft and Attic Quiz

Loft and Attic Quiz

University

10 Qs

Understanding Different Types of Hammers ...

Understanding Different Types of Hammers ...

University

11 Qs

Green Building and Material

Green Building and Material

10th Grade - University

12 Qs

Demolition Works

Demolition Works

Assessment

Quiz

Architecture

University

Medium

Created by

DR IDA

Used 5+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the Progressive Demolition?

•Removal the key structural members to cause complete collapse of the whole structure

•Commonly  known as top – down demolition

•removal of selected parts of the structure by dismantling or deconstruction.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Examples of Deliberate Collapse Mechanisms are

Hand Demolition

Explosive

Wrecking Ball

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Examples of Progressive Demolition are below EXCEPT

Pusher Arm

Wrecking Ball

Wire Rope Pulling

Hand Demolition

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The PRE DEMOLITION PHASES are as below

Site survey - Site Preparation - Soft Stripping - Recycling & Reuse

Site Preparation - Soft Stripping - Recycling & Reuse

Site survey - Site Preparation - Recycling & Reuse - Soft Stripping

Site survey - Recycling & Reuse - Soft Stripping

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A demolition is to be used for 1-storey Shoplot.

Proposed the best method that is most suitable for this project

Wrecking Ball

Hand Demolition

Pusher Arm

Explosion

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

20-Storey High Building is to be demolished.

The site has no adequate access.

Proposed the best method for this activity.

Explosion

Wire Rope

Wrecking Ball

Hand Demolition

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A 5-storey Building is to be demolished.

Adequate access is available.

What is the most economical method to be used?

Explosive

Wrecking Ball

Wire Rope

Pusher Arm

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The Picture shows

Explosion

Wire Rope

Wrecking Ball

Hand Demolition