APR - Prof Prac - Session 02 - Quiz 2

APR - Prof Prac - Session 02 - Quiz 2

University

10 Qs

quiz-placeholder

Similar activities

Social Dimension & Visual Dimension of Urban Design

Social Dimension & Visual Dimension of Urban Design

University

10 Qs

Islamic Architecture of The Middle East And Asia Minor

Islamic Architecture of The Middle East And Asia Minor

University

14 Qs

S21CT Timber Framed Construction

S21CT Timber Framed Construction

University

10 Qs

MPPA_Art, Science, Design_Week 4

MPPA_Art, Science, Design_Week 4

University

6 Qs

Interior Architecture Quiz

Interior Architecture Quiz

University

9 Qs

LAN100 Principle of Design

LAN100 Principle of Design

University

10 Qs

Steel Connection Design Quiz 6

Steel Connection Design Quiz 6

University

14 Qs

MODA 5.1 VIDEO Construction of the Bellas Artes palace

MODA 5.1 VIDEO Construction of the Bellas Artes palace

University

9 Qs

APR - Prof Prac - Session 02 - Quiz 2

APR - Prof Prac - Session 02 - Quiz 2

Assessment

Quiz

Architecture

University

Hard

Created by

Andro Madrogaba

Used 5+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT included in Specialized Allied Services under SPP 203?

Acoustic design

Security system design

Construction supervision

Signage and graphic design

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes the role of the Architect in SPP 204?

Project conceptualization

Monitoring and supervision of construction work

Facility management post-occupancy

Developing cost estimates

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Architect engaged under SPP 204 is directly responsible to:

The contractor

The client/owner

The project manager

The suppliers

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SPP 205 defines Project Management as:

Total process of planning, monitoring, and controlling project resources

Preparing detailed design drawings

Post-construction monitoring only

Evaluating contractor’s bids

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SPP 206 (CAS) integrates which phases of services?

Feasibility, design, financial management

Urban planning, project management, sustainability

Programming, design, and construction supervision

Pre-design, design, post-design, allied and management services

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT listed as a Specialized Allied Service under Doc 203?

Site Development Planning

Acoustic Design Services

Architectural Interiors

Structural Engineering

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The term “Post-Construction Evaluation” belongs to which document?

Doc 203

Doc 205

Doc 207

Doc 209

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?