L3 Plumbing Planning and supervision PT1

L3 Plumbing Planning and supervision PT1

University - Professional Development

10 Qs

quiz-placeholder

Similar activities

Progress Test Intro to QS

Progress Test Intro to QS

University - Professional Development

15 Qs

Building Laws Quiz 1- PD 1096

Building Laws Quiz 1- PD 1096

KG - Professional Development

15 Qs

Uniform Building By Law (1984)

Uniform Building By Law (1984)

University - Professional Development

15 Qs

Plumbing L2 Drainage systems

Plumbing L2 Drainage systems

Professional Development

12 Qs

Cost Reporting Quiz

Cost Reporting Quiz

Professional Development

10 Qs

Basics of Quality Concepts

Basics of Quality Concepts

University

10 Qs

Sustainable and Green COnstruction Quiz

Sustainable and Green COnstruction Quiz

University

15 Qs

Home Insurance Assessment

Home Insurance Assessment

Professional Development

15 Qs

L3 Plumbing Planning and supervision PT1

L3 Plumbing Planning and supervision PT1

Assessment

Quiz

Professional Development

University - Professional Development

Medium

Created by

Nigel Baker

Used 16+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is the most important person on the building site?

You

Client

Architect

Planning officer

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who on site ensure that the building is constructed as per drawings, checking on standard of work and quality of materials?

quantity surveyor

structural engineer

architect

clerk of works

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who on site position the building on the land and ensure that building regulations are followed throughout the process

quantity surveyor

structural engineer

building surveyor

clerk of works

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who on site calculate loads, forces, and variances from wind and rain, looking at structural safety

quantity surveyor

structural engineer

architect

clerk of works

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who on site calculate the amount of labour and materials required to complete the project.

quantity surveyor

structural engineer

architect

clerk of works

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statements describes the role of a subcontractor?

Enter into a contract with the client, and are answerable to them. They carry out a specific or specialist area of work:

Enter into a contract with the main building contractor, and are answerable to them. They carry out a specific or specialist area of work:

Enter into a informal contract with the main building contractor, and are answerable to them. They carry out a specific or specialist area of work:

Enter into a informal contract with the architect, and are answerable to them. They carry out a specific or specialist area of work:

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following Enforces Water Regulations by randomly inspecting occupied properties and all new builds.

Building control officer (BCO)

The health and safety inspector

Electrical services inspector

Water inspector

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?