1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A chiller for comfort cooling that contains 50 pounds or more of R-123 is leaking. Starting in 2019, at what leak rate does the EPA require that the equipment be repaired?
5%
10%
15%
20%
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A cold storage warehouse chooses not to repair an appliance containing R-22 that is leaking above the threshold rate. How long can the facility continue to operate that appliance before it must be retrofitted or retired, assuming no extensions apply?
1 month
9 month
12 month
24 month
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A comfort-cooling appliance containing 50 pounds or more of R-22 is found to be leaking beyond the applicable leak rate threshold. Unless granted additional time, how many days do you have to repair the leak and conduct the initial leak verification test?
1 days
10 days
30 days
45 days
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A company uses a chiller that diverts 55% of its cooling capacity to one of its manufacturing lines and 45% of its cooling capacity to air condition the office spaces. Which leak rate category would this chiller be in?
Industrial process refrigeration
Ice making refrigeration
Commercial refrigeration
Comfort cooling
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A customer has an industrial process refrigeration system that contains 1000 lbs. of R-22 that has exceeded the applicable leak rate threshold. How often is the customer required to perform a leak inspection?
Every month
Every 3 month
Every 6 month
Every 12 month
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
After a leak repair of a supermarket rack using 3000 lbs of R-22 and a successful initial verification test, when must a follow-up leak verification test be conducted?
The same day.
The next day.
Within 10 days.
Within 30 days.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
After installation of a field piped split system, the unit should first be pressurized with;
air and leak checked.
R-22 and leak checked.
R-410A and leak checked.
nitrogen and leak checked.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?