When Sheri is framing a building, sills are installed:
anytime
first
last
sixth
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Because extra strength is needed for support, most framing lumber used for wood buildings should be:
1" thick.
2" thick.
4" thick.
6" thick.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When Jan uses platform-type framing, where is the top plate attached?
above the ceiling joists
below the studs
on top of the rafters
on top of the studs
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When a carpenter frames a building using platform framing, the floor joist header is installed:
anytime.
first.
last.
second.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Trimmer studs for doors are installed:
at the bottom.
at the top.
on each side.
on one side.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the horizontal parts of a building’s framing to which the studs are attached?
foundations
plates
ridges
trusses
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What framing part should a carpenter nail to both the top plate and the sole plate?
ceiling joist
floor joist
rafter
stud
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?