1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the deadline for the solar power plant to start generating electricity?
December 31, 2015
March 31, 2016
January 1, 2016
April 30, 2016
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the target power generation capacity of the solar power plant?
500 megawatts
648 megawatts
750 megawatts
800 megawatts
Tags
CCSS.6.RP.A.3D
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the total land area allocated for the solar power project?
2,000 acres
3,000 acres
1,200 acres
2,500 acres
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which system was installed to manage the solar power plant operations?
DCS
PLC
ERP
SCADA
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How was the solar power plant's impact on the grid managed?
By using batteries
Through manual control
It was unmanaged
Using the SCADA system
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many solar modules were planned to be installed in the project?
2 million
3 million
2.5 million
1 million
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the major challenge faced during the construction of the solar power plant?
Lack of skilled labor
Solar eclipses
Heavy rainfall
Equipment shortage
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?