Civil war-Day 16-Oct 10-PWD-Estimation

Civil war-Day 16-Oct 10-PWD-Estimation

1st - 5th Grade

10 Qs

quiz-placeholder

Similar activities

LEA 6 QUIZ #1

LEA 6 QUIZ #1

1st Grade

15 Qs

KPI Training

KPI Training

KG - Professional Development

10 Qs

Kohlberg's Stages of Moral Development

Kohlberg's Stages of Moral Development

1st - 6th Grade

10 Qs

Body Language Exposed

Body Language Exposed

KG - University

15 Qs

QD QUIZ #3

QD QUIZ #3

1st Grade

15 Qs

Succession Planning For Organisational Excellence

Succession Planning For Organisational Excellence

1st - 3rd Grade

10 Qs

QUIZ 1- INTRODUCTION TO DATA SCIENCE-1

QUIZ 1- INTRODUCTION TO DATA SCIENCE-1

1st Grade

11 Qs

Unit 1Hello 5th Grade

Unit 1Hello 5th Grade

5th - 6th Grade

10 Qs

Civil war-Day 16-Oct 10-PWD-Estimation

Civil war-Day 16-Oct 10-PWD-Estimation

Assessment

Quiz

Professional Development

1st - 5th Grade

Easy

Created by

WINCENTRE CLASSES

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

“Courtyard” is not considered in which of the following estimates?

Approximate quantity method

Unit rate estimate
Lump sum estimate
Plinth area estimate

Answer explanation

In the plinth area estimate, the courtyard and open spaces are excluded as only the covered area is considered.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

During tender submission, the contractor should deposit —————— as a guarantee of the tender.
Security deposit
Earnest money
Caution deposit
None of the above

Answer explanation

The earnest money deposit (EMD) is paid by the contractor when submitting the tender as a sign of commitment.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Choose the correct statement:
The amount deposited by the contractor while submitting the tender is called security deposit
Earnest Money Deposit (EMD) has to be deposited only by the contractor whose tender is accepted by the client
If the lowest quoted contractor refuses to take up the work, his EMD will be forfeited by the client
Security deposit is refunded to the contractor soon after completing the project

Answer explanation

If the lowest bidder refuses to take up the work, his Earnest Money Deposit (EMD) is forfeited by the client.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Estimate expected to be least accurate is:
Supplementary estimate
Plinth area estimate
Detailed estimate
Revised estimate

Answer explanation

The plinth area estimate is the least accurate because it is based only on the average cost per square metre.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For laying or paving 400 sq.m area using 20 cm × 20 cm size paving tiles, the number of tiles required will be
10000
1000
400
4000

Answer explanation

Area of one tile = 0.2 × 0.2 = 0.04 sq.m. Number of tiles = 400 / 0.04 = 10,000 tiles.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Weight of 12 mm dia steel bar per running meter is
0.617 kg
0.789 kg
0.888 kg
0.698 kg

Answer explanation

Theoretical unit weight of steel bar = d² / 162. For 12 mm bar, (12² / 162) = 0.888 kg/m.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The specification of earth work in foundation trenches, drains, etc., lift ordinarily specified is
0 m
1.5 m
5 m
3 m

Answer explanation

Standard lift in earthwork for foundation trenches or drains is 1.5 m.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?