Concrete Estimating

Concrete Estimating

10th Grade

24 Qs

quiz-placeholder

Similar activities

Forces and Aerodynamics of Flight

Forces and Aerodynamics of Flight

9th - 12th Grade

20 Qs

ICEV Review of Applied Engineering

ICEV Review of Applied Engineering

9th - 12th Grade

20 Qs

Basic to 3D Print

Basic to 3D Print

9th - 12th Grade

20 Qs

PLTW CEA 3.1.4 Commercial Roof Systems

PLTW CEA 3.1.4 Commercial Roof Systems

9th - 12th Grade

20 Qs

Flight Plans & Google maps Tutorial

Flight Plans & Google maps Tutorial

7th Grade - University

20 Qs

RHS - Workplace Good Housekeeping Video Quiz

RHS - Workplace Good Housekeeping Video Quiz

9th - 12th Grade

20 Qs

Unit 2 CA Review

Unit 2 CA Review

7th Grade - University

20 Qs

Biofuels: A Sustainable Energy Source

Biofuels: A Sustainable Energy Source

10th Grade - University

20 Qs

Concrete Estimating

Concrete Estimating

Assessment

Quiz

Engineering

10th Grade

Easy

Created by

Marion Cole

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

24 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Common uses of concrete include which of the following?

Building foundations

Food preservation

Textile manufacturing

Medical imaging

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A reinforcing bar is commonly used for which purpose in concrete construction?

To provide tensile strength

To improve insulation

To reduce weight

To provide compression strength

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Estimating how much the concrete will cost involves which of the following steps?

Calculating the required volume and multiplying by the price per unit

Guessing based on previous projects

Using only the price of cement

Ignoring the amount needed

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Estimating the cost of a concrete pad involves which of the following?

Calculating material, labor, and site preparation costs

Only measuring the area of the pad

Guessing based on previous projects

Ignoring labor costs

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A cost estimate in construction is:

an assessment of the expected expenses for a construction project.

a list of materials only for a construction project.

a schedule of project deadlines.

a record of completed work.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Concrete has high ______ strength, yet poor tensile strength. (Fill in the blank)

compression

shear

torsion

bending

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the purpose of adding rebar to concrete?

To increase compression strength

To increase tensile strength

To decrease weight

To improve color

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?