Ujian Penebatan dan Pendawaian

Ujian Penebatan dan Pendawaian

University

20 Qs

quiz-placeholder

Similar activities

Understanding Power Quality Issues

Understanding Power Quality Issues

University

20 Qs

Electro2 MSW1

Electro2 MSW1

University

20 Qs

Quiz on Direct and Alternating Current

Quiz on Direct and Alternating Current

University

19 Qs

CPE10082 Electrical and Electronics Topic 1

CPE10082 Electrical and Electronics Topic 1

University

20 Qs

SCR MCQ Quiz

SCR MCQ Quiz

University

15 Qs

Ch 4 - Electrical Machine P1

Ch 4 - Electrical Machine P1

University

20 Qs

PRACTICE TEST ARDUINO

PRACTICE TEST ARDUINO

11th Grade - University

20 Qs

Transformer and Harmonic Components Quiz

Transformer and Harmonic Components Quiz

University

15 Qs

Ujian Penebatan dan Pendawaian

Ujian Penebatan dan Pendawaian

Assessment

Quiz

Engineering

University

Hard

Created by

ISMAIL JUNI

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of insulation testing?

To test the mechanical strength of cables

To prevent current leakage

To reduce voltage

To increase current

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What tool is used for cable insulation testing?

Megger

Multimeter

Clamp meter

Test pen

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of earth continuity testing?

To test overload current

To ensure the earth connection is functioning

To measure voltage

To test load resistance

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What tool is used to measure electric current?

Voltmeter

Ammeter

Ohmmeter

Megger

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of short circuit testing?

To ensure there is no direct phase-neutral connection

To test load power

To determine voltage levels

To measure cable temperature

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the earth resistance is too high, what will happen?

Reduce the risk of shock

Increase the risk of electric shock

Reduce voltage

Disconnect the circuit

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step before performing wiring maintenance?

Install a new load

Disconnect the power supply

Test the cables

Install MCB

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?