Unit 67 preview

Unit 67 preview

Professional Development

15 Qs

quiz-placeholder

Similar activities

cooling 2

cooling 2

Professional Development

20 Qs

A+ Practice Questions 16

A+ Practice Questions 16

Professional Development

10 Qs

CSTP DAIKIN REFRIGERATION MALAYSIA SDN. BHD.

CSTP DAIKIN REFRIGERATION MALAYSIA SDN. BHD.

Professional Development

20 Qs

mems n procs

mems n procs

Professional Development

10 Qs

FUN 101 Week 7 Test Bearings, Lubricants & Seals

FUN 101 Week 7 Test Bearings, Lubricants & Seals

Professional Development

20 Qs

DSL-205 Mid-Term

DSL-205 Mid-Term

Professional Development

20 Qs

HVAC Recovery EPA 608

HVAC Recovery EPA 608

Professional Development

18 Qs

post-test CRDe EXPERT

post-test CRDe EXPERT

Professional Development

20 Qs

Unit 67 preview

Unit 67 preview

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Timothy McIntyre

Used 4+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Technician A says that a refrigerant identifier should be installed on the low-side. Technician B says that a refrigerant identifier should always be installed on the high-side. Who is correct?

Technician A

Technician B

Both Technician A and Technician B

Neither technician A nor Technician B

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statements is NOT true regarding a recovery machine?

An approved machine must always be used.

The machine used must be for that specific type of refrigerant.

c.

A recovery machine can be a stand-alone unit or part of an R/R/R machine

The recovery machine always recycles the refrigerant.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the diagnosis of a faulty HVAC system determines that a component of the air-conditioning system is not working properly, such as a faulty cycle switch, then _______ is not needed.

Leak testing

Reclaiming

Evacuating

Charging

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The use of a(n) __________ will protect the investment in approved refrigerant handling and test equipment.

Four channel probe

Sealant detection test

Recovery, recycle, and recharge machine

Oil injector

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum amount of time an air-conditioning system should be evacuated for to effectively boil all the water out of the system?

10 minutes

15 minutes

30 minutes

45 minutes

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Typically, the thermal expansion valve (TXV) is mounted on the of the evaporator.

Front

Side

Back

Rear

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Technician A states that an air-conditioning performance test usually requires that an auxiliary condenser fan be used during the test. Technician B states that a performance test will show if the air-conditioning system is contaminated with sealer. Who is correct?

Technician A

Technician B

Both Technician A and Technician B

Neither Technician A nor Technician B

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development