Search Header Logo

Facilities Maintenance System Quiz

Authored by Chang Richard

Other

University

Used 2+ times

Facilities Maintenance System Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes the purpose of a Work Order (WO) system in facilities maintenance?

To monitor employee attendance

To track asset depreciation

To initiate, document, and manage maintenance activities

To control tenant access and security levels

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A chiller unit is due for quarterly servicing. What type of maintenance does this fall under?

Emergency maintenance

Predictive maintenance

Reactive maintenance

Scheduled preventive maintenance

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the maintenance priority hierarchy, which of the following should be addressed FIRST?

Flickering lights in the hallway

Pest control request in the breakroom

A burst water pipe flooding a server room

Routine filter replacement for air handling units

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary difference between a corrective WO and a preventive WO in a CMMS database?

Preventive WO requires approval; corrective does not

Corrective WO is triggered by equipment failure or inspection, while preventive WO is pre-scheduled

Preventive WO includes cost estimation; corrective WO does not

Corrective WO cannot be closed without a supervisor’s signature

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary advantage of integrating a Computerized Maintenance Management System (CMMS)?

Reduces rental rates for tenants

Automates cleaning schedules

Tracks and manages work orders efficiently

Replaces the need for physical maintenance teams

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT typically part of a comprehensive maintenance working procedure?

Purpose statement

Frequency of task

Procurement vendor ratings

Responsible personnel

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of these examples best illustrates a performance standard used to evaluate maintenance work?

“Technician responds within 2 hours to all emergency calls.”

“Manager chooses their own task priorities.”

“Work orders are filled out in pencil or pen.”

“Inventory is reviewed every 6 months without verification.”

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?