Plant Layout and Safety Quiz

Plant Layout and Safety Quiz

Professional Development

36 Qs

quiz-placeholder

Similar activities

Cardiovascular System Quiz2

Cardiovascular System Quiz2

Professional Development

40 Qs

Review Mid term

Review Mid term

Professional Development

39 Qs

Final Deneme

Final Deneme

Professional Development

41 Qs

English Level Test PRE-INTERMEDIATE 2A

English Level Test PRE-INTERMEDIATE 2A

Professional Development

40 Qs

STS211(MIDTERM EXAM)

STS211(MIDTERM EXAM)

Professional Development

32 Qs

Unit 2 AP Chemistry (Set I)

Unit 2 AP Chemistry (Set I)

Professional Development

40 Qs

E200-5 Word Blanks 1

E200-5 Word Blanks 1

Professional Development

33 Qs

Savdo va xaridlar bo'yicha test

Savdo va xaridlar bo'yicha test

Professional Development

38 Qs

Plant Layout and Safety Quiz

Plant Layout and Safety Quiz

Assessment

Quiz

Others

Professional Development

Practice Problem

Medium

Created by

Nallisai Amizhdhu

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

36 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not a major factor in the selection of a plant site?

Availability of raw materials

Proximity to entertainment centers

Transport facilities

Availability of skilled labor

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Product layout is most suitable when:

Production is intermittent

Products are customized

Production is continuous and standardized

Large variety of products are made

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fixed position layout is commonly used in:

Chemical industries

Automobile manufacturing

Ship building

Textile industries

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main objective of plant layout is to:

Increase production cost

Minimize material handling cost

Increase floor area

Decrease the number of machines

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Breakdown maintenance is carried out:

Before failure occurs

As per schedule

After equipment fails

Only once a year

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of maintenance is planned in advance and carried out at regular intervals?

Breakdown maintenance

Predictive maintenance

Preventive maintenance

Corrective maintenance

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Preventive maintenance helps to:

Increase breakdowns

Increase downtime

Reduce the life of equipment

Reduce unexpected equipment failures

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?