MP F1 PC2

MP F1 PC2

Professional Development

117 Qs

quiz-placeholder

Similar activities

PPT Retro D - Dec 2022-

PPT Retro D - Dec 2022-

Professional Development

120 Qs

Manufacturing Processes

Manufacturing Processes

Professional Development

120 Qs

Compressor

Compressor

Professional Development

114 Qs

DAY 2 - RULE 7 & 8

DAY 2 - RULE 7 & 8

Professional Development

114 Qs

Serv1

Serv1

Professional Development

121 Qs

Semester 3 Exam Part 2

Semester 3 Exam Part 2

University - Professional Development

120 Qs

DE Quiz 2

DE Quiz 2

Professional Development

118 Qs

Dates Passkey

Dates Passkey

Professional Development

112 Qs

MP F1 PC2

MP F1 PC2

Assessment

Quiz

Other

Professional Development

Hard

Created by

Bini Bini

Used 1+ times

FREE Resource

117 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Plumbing fixtures, according to Code, cannot be located in such a manner:

as to prevent their use by the physically handicapped

as to prevent calculation of minimum fixture unit load in sizing drainage piping

as to confuse the need for additional fixtures

as to interfere with the normal operation of a door

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pipe trench excavation deeper than and parallel to footings, according to Code, must not be placed within an angle of pressure as transferred from the base of the structure to the sides of the excavation. The piping must be from the footings.

25 degrees

30 degrees

45 degrees

55 degrees

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Having a unique plumbing installation, the plumber decides to test the system with air. According to Code, air must be forced into the system until there is a uniform gauge pressure of _ pounds per square inch.

5

10

15

20

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Code specifies that vertically installed piping must be secured at sufficiently close intervals to;

carry the weight of the pipe

carry the weight of the pipe and its contents

prevent strains or stresses

prevent sagging

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In accordance with Code, horizontally installed piping must be supported at sufficiently close intervals to:

carry the weight of the pipe

carry the weight of the pipe and its contents

prevent strains or stresses

prevent Sagging

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Code requires that all piping installed in corrosive type material be:

first approved by the Plumbing official

supported properly

protected properly

in accordance with manufacturer’s recommendations

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Code requires that vertical galvanized steel piping be supported at not less than:

8-foot intervals

10-foot intervals

every story height

every other story height

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?