Search Header Logo

BIM in Civil Engineering

Authored by Amruthavarshini Civil

Other

University

Used 1+ times

BIM in Civil Engineering
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the output in Level 0 of BIM maturity?

Paper drawings

3D models

Digital collaboration

Cloud-based applications

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main difference between Level 0 and Level 1 in BIM maturity?

Use of 3D models

Minor process changes

Digital collaboration

Interdisciplinary models

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Level 2 of BIM maturity involve?

2D documentation

Interdisciplinary nD models

Single shared model

Paper drawings

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the 4th dimension in BIM?

Cost

Time

Facilities Management

3D modelling

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does 5D modelling include?

Time information

Cost information

3D objects

4D scheduling

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the focus of the 6th dimension in BIM?

Cost reduction

Time management

3D modelling

Project scheduling

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a benefit of laser scanning in BIM?

Increased errors

Future modelling aid

Less accurate documentation

Higher costs

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?