
Primary Ventilated Stack Systems Quiz
Authored by George Blay-Kwofie
Other
12th Grade

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
30 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary function of collared bosses in a primary ventilated stack system?
To increase the diameter of the main stack and allow connections to be made
To reduce the water pressure in the stack
To filter out solid waste from the stack
To decrease the number of connections in the stack
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why are collared bosses inserted into the main soil stack in a primary ventilated stack system?
To prevent crossflow and allow for more connections
To block unused connections
To reduce the height of the stack
To increase water flow speed
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In what type of location are primary ventilated stacks most commonly used?
Internally, where multiple connections are required in one location
Externally, for single connection points
In outdoor drainage systems only
In industrial waste treatment plants
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How does the use of collared bosses in a primary ventilated stack affect the main stack?
It increases the diameter of the main stack
It decreases the diameter of the main stack
It blocks the main stack
It shortens the main stack
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which feature of a primary ventilated stack makes it suitable for use in a bathroom suite?
Ability to handle multiple connections in one location
Its small size
Its decorative appearance
Its use of metal materials
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which statement best describes the use of primary ventilated stacks?
They are used internally for multiple connections in one location
They are used externally for single connections
They are only used in industrial settings
They are used to filter water
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If a bathroom suite requires several fixtures to be connected to the same stack, which system should be used?
Primary ventilated stack
Open channel system
Single pipe system
Septic tank system
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
25 questions
Chapter 1- Study Guide
Quiz
•
12th Grade
25 questions
IGCSE Economics Glossary Terms - M
Quiz
•
9th - 12th Grade
25 questions
New Zealand :>
Quiz
•
KG - Professional Dev...
25 questions
Vocabulario: Meses y Familia
Quiz
•
9th - 12th Grade
25 questions
ULANGAN HARI PPKN KELAS 11
Quiz
•
12th Grade
25 questions
JP Note and Rest Values
Quiz
•
1st - 12th Grade
27 questions
Job Seeking Skills
Quiz
•
9th - 12th Grade
25 questions
SIMULASI TRY OUT SNBT 2024
Quiz
•
12th Grade
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
54 questions
Analyzing Line Graphs & Tables
Quiz
•
4th Grade
22 questions
fractions
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
15 questions
Equivalent Fractions
Quiz
•
4th Grade
Discover more resources for Other
20 questions
-AR -ER -IR present tense
Quiz
•
10th - 12th Grade
15 questions
Making Inferences
Quiz
•
7th - 12th Grade
12 questions
Add and Subtract Polynomials
Quiz
•
9th - 12th Grade
7 questions
How James Brown Invented Funk
Interactive video
•
10th Grade - University
15 questions
Atomic Habits: Career Habits
Lesson
•
9th - 12th Grade
20 questions
Banking
Quiz
•
9th - 12th Grade
15 questions
Exponential Growth and Decay Word Problems Practice
Quiz
•
9th - 12th Grade
18 questions
AP Bio Insta-Review Topic 6.1*: DNA & RNA Structure
Quiz
•
9th - 12th Grade