The Construction Industry Questions

The Construction Industry Questions

Professional Development

32 Qs

quiz-placeholder

Similar activities

Asbestos Certification

Asbestos Certification

Professional Development

36 Qs

ECS - 8. Work Equipment

ECS - 8. Work Equipment

Professional Development

28 Qs

Hot water revision level 2

Hot water revision level 2

Professional Development

31 Qs

Robotics Quiz#2

Robotics Quiz#2

University - Professional Development

30 Qs

Regulations and Standards

Regulations and Standards

Professional Development

37 Qs

Knowledge Check - Mutual Fund TIK's

Knowledge Check - Mutual Fund TIK's

Professional Development

28 Qs

NC Real Estate Chapter 6

NC Real Estate Chapter 6

Professional Development

28 Qs

LCTA Contract

LCTA Contract

Professional Development

30 Qs

The Construction Industry Questions

The Construction Industry Questions

Assessment

Quiz

Other

Professional Development

Medium

Created by

Jack Caro

Used 2+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

32 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Energy efficiency in construction relates to methods and materials which...

Limit energy use

Effect heat loss

Produce energy

Control heat gain

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Designated skips and containers are mainly used to...

Increase recycling of waste

Reduce land fill

To avoid financial penalty

To resell waste for profit

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does ‘just in time’ mean, with respect to construction.

Completing the project at the last possible hour

Materials are ordered and delivered just at the point they are required

Paying employee wages on the last day of the project

Using cement before it hardens

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The environmental benefit of the use of off-site construction is that it...

Is only suitable for social housing

Reduces the amount of waste material

Increases site deliveries

Increases build times

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following statements describes a risk assessment?

A feasibility study into the likely harm caused to an operative where standards are not upheld

A report to the highway’s agency detailing project dangers

A statement of where the project is likely to be unsuccessful against specified deadlines

An assessment of safety dangers related to the task being carried out

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When preparing complex construction components, which of the following are appropriate sources of information?

Delivery ledger and tool box talk sign-off sheets

Method statements and specification

Hand tool inspection sheets and fire risk assessment

Time sheets and induction log

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What information is shown in drawings and specifications?

When site opening hours are

Site layout and fire assembly points are

Where the nearest hospital is

What materials go in which floor area, floor area sizes

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?