Calgary's Shaganappi Bridge

Calgary's Shaganappi Bridge

10th Grade

20 Qs

quiz-placeholder

Similar activities

Topic 5 - Ethics and Professionalism in Civil Eng

Topic 5 - Ethics and Professionalism in Civil Eng

University

15 Qs

Truss Questions

Truss Questions

12th Grade

16 Qs

Da Vinci's Self-Supporting Bridge

Da Vinci's Self-Supporting Bridge

10th Grade - University

20 Qs

Rectifiers and AC Controllers

Rectifiers and AC Controllers

University

15 Qs

2025 Wolf Domestication

2025 Wolf Domestication

7th Grade - University

15 Qs

Quiz Workshop Proteus 2025

Quiz Workshop Proteus 2025

University

15 Qs

Engineering Concepts Quiz

Engineering Concepts Quiz

11th Grade

23 Qs

Female Engineers  Who Shaped Our World

Female Engineers Who Shaped Our World

7th Grade - University

22 Qs

Calgary's Shaganappi Bridge

Calgary's Shaganappi Bridge

Assessment

Quiz

Engineering

10th Grade

Hard

Created by

Jason Rauch

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the primary purpose of the Shaganappi Bridge?

To serve as a tourist attraction

To connect two cities

To increase vehicle traffic

To enhance pedestrian safety

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the main issue with the Shaganappi Bridge installation?

The bridge was too expensive

The bridge was too short

The cross beams were misaligned

The materials used were substandard

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much was the cost of the engineering blunder?

$2 million

$1 million

$10 million

$5 million

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the misalignment measurement that caused the issue?

11 centimeters

5 centimeters

15 centimeters

20 centimeters

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of bridge design was used for the Shaganappi Bridge?

Suspension bridge

Cantilever bridge

Beam bridge

Tied-arch bridge

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the reaction of the residents to the bridge misalignment?

They were unaware

They were pleased

They were disappointed

They were indifferent

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the temporary solution for the misaligned bridge?

Demolishing the bridge

Painting the bridge

Rebuilding the bridge

Abandoning the bridge

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?