
CNC EDM Die Sinker Basics Quiz
Authored by AZNIZAM AHMAD
Engineering
11th Grade
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step in mounting the electrode holder on a CNC EDM Die Sinker machine?
Press the CLAMP button
Insert the electrode holder into the slot
Hold the electrode and bring the holder close to the mounting mechanism
Press the ACK button
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What sound indicates that the chuck mechanism is released?
A beep
A click
A buzz
A ring
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
After inserting the electrode holder into the designated slot, which button should be pressed to lock it in place?
ACK button
CLAMP button
Z- button
MFR 3 button
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which axis movements are possible using the remote control pendant on a CNC EDM Die Sinker machine?
X and Y only
Z only
X, Y, and Z
Y and Z only
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the fastest Manual Feed Rate (MFR) available on the machine?
MFR 0
MFR 1
MFR 2
MFR 3
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which button would you press to move the electrode in the positive Z direction?
Z+
Z-
Y+
X+
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be ensured before proceeding after mounting the electrode holder?
The machine is turned off
The electrode holder is securely mounted
The feed rate is set to MFR 0
The ACK button is pressed again
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?