OM, OR

OM, OR

Professional Development

19 Qs

quiz-placeholder

Similar activities

HESI A2 Math Practice Test

HESI A2 Math Practice Test

University - Professional Development

15 Qs

Google Classroom- GCE2

Google Classroom- GCE2

Professional Development

16 Qs

FARM POWER

FARM POWER

Professional Development

20 Qs

GCSE maths quiz based on UK COVID status at 7 Jan 2020.

GCSE maths quiz based on UK COVID status at 7 Jan 2020.

Professional Development

20 Qs

Principles of Engine Operation

Principles of Engine Operation

Professional Development

15 Qs

Power Plant & Energy Engineering

Power Plant & Energy Engineering

Professional Development

20 Qs

Time and Work Quiz

Time and Work Quiz

Professional Development

20 Qs

Ratios and Unit Rates By adam nation and michael schwab

Ratios and Unit Rates By adam nation and michael schwab

6th Grade - Professional Development

15 Qs

OM, OR

OM, OR

Assessment

Quiz

Mathematics

Professional Development

Hard

Created by

Anne Pascual

Used 3+ times

FREE Resource

19 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

What is the type of objective function it the given problem?


An animal feed company must produce 200 kg of a mixture consisting of ingredients A and B daily. A costs Rs. 3 per kg and B costs Rs. 8 per kg. Not more than 80 kg of A can be used and at least 60 kg of B must be used.

2.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

The primal problem refers to the original optimization problem, while the _______ problem is derived from the primal problem. The _______ provides insights into the bounds on the objective function and helps in interpreting the economic meaning of constraints.

3.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

_____________ is used for optimization problems where some or all of the decision variables must take integer values, often applied in scenarios like scheduling, facility location, and resource allocation.

4.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

The _____________ is the longest sequence of dependent tasks in a project, determining the minimum time required to complete the project.

5.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

____________ is the established time required to perform a task or operation under normal working conditions, allowing for allowances for rest, delays, and interruptions. It is used to set benchmarks for productivity.

6.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

are a set of basic hand motions used to analyze work processes. Developed by Frank and Lillian Gilbreth, they help in breaking down tasks into fundamental movements to identify inefficiencies and suggest improvements.

7.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

____________ are methods used to determine the time required to perform a task based on the time needed for predefined basic motions. These systems provide standard time values for common motions used in industrial tasks, helping to improve accuracy and consistency in time measurement

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?