A surveying instructor sent out six groups of students to measure a distance between two points on the ground. The students came up with the following six different values: 150.52, 150.35, 150.89, 150.02, 150.98 and 150.78. Assuming these values are equally reliable and that variations results from accidental errors, determine the most probable value of the distance measured.
Beat the Clock 4 (MSTE)

Quiz
•
Mathematics
•
Professional Development
•
Hard

Godfrey Correa
Used 3+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
150.49
150.59
150.69
150.79
2.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Estimate the actual bucket load in bank cubic meters for loader bucket whose heaped capacity is 3.82 m3. The soil's bucket fill factor is 0.9 and its load factor is 0.8.
1.75 BCM
2.75 BCM
3.75 BCM
4.75 BCM
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Initially, the number of bacteria present in a culture is No. At t = 1 hour the number of bacteria is measured to be 3/2 No. If the rate of growth is assumed to be proportional to the number of bacteria present, determine the time necessary for the number of bacteria to triple.
1.7 hrs
2.7 hrs
3.7 hrs
4.7 hrs
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The distance between the entrance and exit points on a horizontal circular roadway curve is 747 ft. The radius of the curve is 400 ft. Determine the central angle between the entrance and exit points.
107 deg
117 deg
127 deg
137 deg
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
It is known that 80 percent of all families won a television set. If 10 families are interviewed at random, find the probability that 7 families own a television set.
0.102
0.120
0.201
0.210
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The probability that a freshman entering a university will graduate after a four-year program is 0.6. If 1000 students enroll at university, find the standard deviation of the number of students who graduated.
15.49
15.94
51.49
51.94
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Megan is a recent civil engineering graduate. One of her first job is to calculate a bridge cost using the following data. The first cost will be $49,000, the annual operating costs for energy and maintenance will be $15,000, the expected life in 10 years, the expected salvage value is 0 and the firm's interest rate is 9%. What is EAC?
$22.6k
$26.2k
$26.6k
$22.2k
Create a free account and access millions of resources
Similar Resources on Wayground
20 questions
Q#4-WK#-1-Matrices 01

Quiz
•
11th Grade - Professi...
20 questions
Kannan Test 1

Quiz
•
Professional Development
20 questions
Basic maths

Quiz
•
Professional Development
22 questions
Evaluación reforzamiento

Quiz
•
Professional Development
20 questions
Toán gk2 l4

Quiz
•
Professional Development
15 questions
Мерење и мерни единици - 5 одд.

Quiz
•
Professional Development
20 questions
P6 Math Quiz No.3

Quiz
•
Professional Development
25 questions
Introduction to Finance

Quiz
•
University - Professi...
Popular Resources on Wayground
25 questions
Equations of Circles

Quiz
•
10th - 11th Grade
30 questions
Week 5 Memory Builder 1 (Multiplication and Division Facts)

Quiz
•
9th Grade
33 questions
Unit 3 Summative - Summer School: Immune System

Quiz
•
10th Grade
10 questions
Writing and Identifying Ratios Practice

Quiz
•
5th - 6th Grade
36 questions
Prime and Composite Numbers

Quiz
•
5th Grade
14 questions
Exterior and Interior angles of Polygons

Quiz
•
8th Grade
37 questions
Camp Re-cap Week 1 (no regression)

Quiz
•
9th - 12th Grade
46 questions
Biology Semester 1 Review

Quiz
•
10th Grade