
Floor and Wall Framing
Authored by MELISSA McKINSTRIE
Construction
9th - 12th Grade
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
22 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Full-length studs become ____ when they end due to an opening.
timmer stud
cripple stud
headers
top plates
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In climates that require the house to be well insulated, ____ studs ar commonly used for exterior walls
2x2
2x4
2x6
2x8
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Always locate joints over a ____
header
parition
stud
nailer
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To keep a wall frame section square while sheathing is being applied, a ____ fastened across on corner.
backup clip
diagonal brace
blocker board
plywood spacer
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Immediately after a wall section is up, secure it with ____.
studs
nails
braces
metal ties
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The top plate is ____ in traditional framing.
omited
doubled
tripled
braced
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The type of framing used in most residential construction is ____ framing.
platform
balloon
post-and-beam
plank-and-beam
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?