1.7- Manufacturing Scale and Infrastructure

1.7- Manufacturing Scale and Infrastructure

11th Grade

29 Qs

quiz-placeholder

Similar activities

3.1.2 - Engineering Design and the Scientific Method

3.1.2 - Engineering Design and the Scientific Method

10th Grade - University

30 Qs

Chapter 2: Engineering as a Profession - Key Terms

Chapter 2: Engineering as a Profession - Key Terms

10th Grade - University

30 Qs

2.4.1 - Engineering Impacts

2.4.1 - Engineering Impacts

10th Grade - University

32 Qs

Unit 1- quiz B

Unit 1- quiz B

11th Grade

29 Qs

1.1 Engineering and Manufacturing: Principles and Methodologies

1.1 Engineering and Manufacturing: Principles and Methodologies

11th Grade

30 Qs

2.1.2 - Energy, Efficiency, and the Environment

2.1.2 - Energy, Efficiency, and the Environment

10th Grade - University

24 Qs

2.1.1 - Engineering Roles and Functions

2.1.1 - Engineering Roles and Functions

10th Grade - University

30 Qs

Understanding the Engineering Design Process

Understanding the Engineering Design Process

11th Grade

24 Qs

1.7- Manufacturing Scale and Infrastructure

1.7- Manufacturing Scale and Infrastructure

Assessment

Quiz

Engineering

11th Grade

Easy

Created by

Ben Kinnison

Used 2+ times

FREE Resource

29 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the context of engineering and manufacturing, approaches to manufacturing, processing, and control often consider the ______ of manufacturing operations.

scale

smell

taste

sound

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a type of manufacturing scale?

Ergonomic

One-off

Batch

Mass

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: The concept of _______ in manufacturing includes prototype, one-off, batch, mass, and continuous production.

Infrastructure

Scale

Design

Quality

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not a main scale of production?

One-off/prototype

Batch production

Mass production

Custom production

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: The four main scales of production are One-off/prototype, Batch production, Mass production, and ________.

A) Custom production

B) Continuous production

C) Limited production

D) Variable production

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a prototype in the context of engineering and manufacturing?

A final product

An initial draft version of a product

A mass-produced item

A recycled product

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

One-off production is sometimes referred to as ______ production.

mass

batch

job

continuous

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?