Preparing Construction Sites for Setting Out Procedures

Preparing Construction Sites for Setting Out Procedures

12th Grade

15 Qs

quiz-placeholder

Similar activities

PRODUKTIF DESAIN PEMODELAN DAN INFORMASI BANGUNAN

PRODUKTIF DESAIN PEMODELAN DAN INFORMASI BANGUNAN

12th Grade

10 Qs

Le patrimoine mondial de la France

Le patrimoine mondial de la France

11th Grade - University

10 Qs

Data Collection Quiz

Data Collection Quiz

12th Grade

15 Qs

Passive Energy Houses Quiz

Passive Energy Houses Quiz

12th Grade

15 Qs

CONSTRUCTION DRAWINGS

CONSTRUCTION DRAWINGS

12th Grade

11 Qs

1995 CSI Masterformat - 01

1995 CSI Masterformat - 01

7th Grade - Professional Development

16 Qs

Kelas XII-DPIB TES 1

Kelas XII-DPIB TES 1

12th Grade

20 Qs

Revit Architecture Exam I

Revit Architecture Exam I

10th - 12th Grade

20 Qs

Preparing Construction Sites for Setting Out Procedures

Preparing Construction Sites for Setting Out Procedures

Assessment

Quiz

Architecture

12th Grade

Hard

Created by

Glenn Coley

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

State the importance of site preparation in construction projects.

Ensures safety and efficiency

Increases project cost

Delays project timeline

Reduces quality of construction

2.

OPEN ENDED QUESTION

3 mins • 1 pt

What is the purpose of site preparation?

Evaluate responses using AI:

OFF

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Site preparation enables precise placement of buildings and infrastructure as per design ________.

The question has a diagram associated with it. The diagram has been stored separately.

plans

requirements

specifications

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in preparing a construction site?

Clearing and Excavation

Site Survey and Assessment

Levelling and Grading

Marking and Setting Out

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: Conduct a __________ survey as part of the site survey and assessment.

Conduct a topographical survey as part of the site survey and assessment.

Conduct a geological survey as part of the site survey and assessment.

Conduct a biological survey as part of the site survey and assessment.

Conduct a meteorological survey as part of the site survey and assessment.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a part of the Clearing and Excavation step?

Remove vegetation

Conduct a topographical survey

Excavate to required depths for foundations

Remove unwanted structures

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: Ensure the site is level and free from __________ during levelling and grading.

debris

water

vegetation

rocks

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?