PPT 11 - Decommission systems and components

PPT 11 - Decommission systems and components

12th Grade

11 Qs

quiz-placeholder

Similar activities

PPT 3 - Pipework & Circulation COL

PPT 3 - Pipework & Circulation COL

12th Grade - University

15 Qs

EG1W4

EG1W4

12th Grade

10 Qs

Maintenance Indicators

Maintenance Indicators

12th Grade

15 Qs

BSE PPT 5 Commercial/Industrial  Quiz

BSE PPT 5 Commercial/Industrial Quiz

12th Grade

15 Qs

307 Central Heating Systems 3 Quiz

307 Central Heating Systems 3 Quiz

2nd Grade - University

10 Qs

212 ppt3 Site preparation Quiz

212 ppt3 Site preparation Quiz

12th Grade

15 Qs

Levelling in Surveying Quiz

Levelling in Surveying Quiz

12th Grade

15 Qs

Hot Water System Regulations Quiz

Hot Water System Regulations Quiz

12th Grade

15 Qs

PPT 11 - Decommission systems and components

PPT 11 - Decommission systems and components

Assessment

Quiz

Construction

12th Grade

Medium

Created by

Adam Dreifuss

Used 2+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is decommissioning in the context of plumbing?

The process of installing a new system

The isolation of a system for repair, extension, renewal, or removal

The maintenance of a system to ensure efficiency

The upgrading of a system to a newer model

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens during temporary decommissioning?

The system is permanently removed

The system is isolated and then put back into operation

The system is upgraded to a new version

The system is left unused indefinitely

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a characteristic of permanent decommissioning?

The system is temporarily isolated

The system is upgraded and reused

The system is isolated, drained, and pipework is capped

The system is left operational but unused

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is important to ensure when decommissioning a building?

The occupier is unaware of your actions.

The occupier is aware of your actions.

The building is left unattended.

The work is done during peak hours.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to minimize disruption to the user during decommissioning?

Isolate the entire system.

Isolate only part of the system.

Ignore user needs.

Work without any isolation.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What action should be taken regarding existing pipework during decommissioning?

Leave it as it is.

Cap off existing pipework.

Remove all pipework.

Ignore the pipework.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be placed against stop valves and service valves during decommissioning?

Warning signs.

Decorative signs.

No signs are needed.

Signs indicating permanent closure.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?