PPT 11 - Decommission systems and components

PPT 11 - Decommission systems and components

12th Grade

11 Qs

quiz-placeholder

Similar activities

AC 2.2 Cold Water Supply Systems in the UK

AC 2.2 Cold Water Supply Systems in the UK

12th Grade

15 Qs

Plumbing Processes and Techniques

Plumbing Processes and Techniques

12th Grade

11 Qs

Drainage Systems, Foul and Surface water

Drainage Systems, Foul and Surface water

11th Grade - University

10 Qs

Hot Water Systems RECAP

Hot Water Systems RECAP

12th Grade - University

15 Qs

L1 Cavity - Insulation & Features

L1 Cavity - Insulation & Features

12th Grade

6 Qs

Electrical Technology NCCER (11th Edition) Module 1 Review

Electrical Technology NCCER (11th Edition) Module 1 Review

9th - 12th Grade

10 Qs

How Does The Power Grid Work QUIZ

How Does The Power Grid Work QUIZ

9th - 12th Grade

10 Qs

Soalan Sistem Sanitari

Soalan Sistem Sanitari

12th Grade

10 Qs

PPT 11 - Decommission systems and components

PPT 11 - Decommission systems and components

Assessment

Quiz

Construction

12th Grade

Medium

Created by

Adam Dreifuss

Used 2+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is decommissioning in the context of plumbing?

The process of installing a new system

The isolation of a system for repair, extension, renewal, or removal

The maintenance of a system to ensure efficiency

The upgrading of a system to a newer model

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens during temporary decommissioning?

The system is permanently removed

The system is isolated and then put back into operation

The system is upgraded to a new version

The system is left unused indefinitely

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a characteristic of permanent decommissioning?

The system is temporarily isolated

The system is upgraded and reused

The system is isolated, drained, and pipework is capped

The system is left operational but unused

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is important to ensure when decommissioning a building?

The occupier is unaware of your actions.

The occupier is aware of your actions.

The building is left unattended.

The work is done during peak hours.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to minimize disruption to the user during decommissioning?

Isolate the entire system.

Isolate only part of the system.

Ignore user needs.

Work without any isolation.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What action should be taken regarding existing pipework during decommissioning?

Leave it as it is.

Cap off existing pipework.

Remove all pipework.

Ignore the pipework.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be placed against stop valves and service valves during decommissioning?

Warning signs.

Decorative signs.

No signs are needed.

Signs indicating permanent closure.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?