PPT 9 - Install and test systems and components

PPT 9 - Install and test systems and components

12th Grade

28 Qs

quiz-placeholder

Similar activities

Introduction to Highways and Traffic Engineering

Introduction to Highways and Traffic Engineering

12th Grade

28 Qs

Tools

Tools

9th Grade - University

30 Qs

Plumbing Processes PPT 2 - Power Tools

Plumbing Processes PPT 2 - Power Tools

12th Grade - University

25 Qs

Condenser Unit Quiz

Condenser Unit Quiz

12th Grade

27 Qs

knowledge check 3

knowledge check 3

12th Grade

27 Qs

HSSE REVISION MCQ

HSSE REVISION MCQ

12th Grade

30 Qs

Quizizz 4B

Quizizz 4B

12th Grade

25 Qs

Understand the requirements of drainage systems

Understand the requirements of drainage systems

12th Grade

31 Qs

PPT 9 - Install and test systems and components

PPT 9 - Install and test systems and components

Assessment

Quiz

Construction

12th Grade

Medium

Created by

Adam Dreifuss

Used 2+ times

FREE Resource

28 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the requirements for a plumbing system after installation?

It must be painted.

It must be sound (no leaks).

It must be expanded.

It must be insulated.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "flushed through" mean in the context of plumbing?

Painted externally

Cleaned internally

Expanded in size

Insulated properly

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "disinfected" refer to in plumbing system testing?

Mechanically cleaned

Painted with a sealant

Chemically cleaned

Expanded for more capacity

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "commissioned" mean in the context of plumbing?

Set up correctly

Painted and sealed

Expanded and insulated

Mechanically adjusted

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing process?

Visual inspection

Soundness test

Deccomission

Flushing out

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step comes immediately after the soundness test in the testing process?

Visual inspection

Flushing out

Disinfecting

Hand over to customer

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the testing process before handing over to the customer?

Commissioning

Visual inspection

Soundness test

Flushing out & Disinfecting

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?