
Transformer Connection Quiz
Authored by Caleb Lenz
Other
Professional Development
Used 8+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
16 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If the primary coil voltage ratings of the transformers match the _____________________, then connect _____________.
phase-to-phase voltage of the system; Wye.
phase-to-ground voltage of the system; Delta.
phase-to-ground voltage of the system; Wye.
system voltage on the work order; Wye.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During a practical session, Elijah was examining a transformer that had only one number for a primary coil voltage rating. He wondered what this indicated about its usage.
it should be used for phase-to-ground connections only.
the transformer can only be used for open-banks.
it should be used on Wye systems only.
it should be used for Delta connections only.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Ava is working on a project that involves setting up electrical systems. She needs to determine which of these service voltages on the work order require “Alley-Cat/Bad-Dog”?
120/208
240
120/240
240/480
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Aiden and Sophia are working on a project involving transformers. They need to decide on the configuration of the secondary windings. What is the reason for connecting the secondary windings in parallel?
Because the service voltage will not be correct unless we parallel the windings.
So that we can get the voltage we need in a Delta secondary.
To use the full kVA rating of the transformers.
That is the only way we can get phase-to-phase for the service.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of these combinations best represents the connection for paralleling the windings?
Connect “A” and “B” together to a bushing, then “C” and “D” together to another bushing.
Connect “A” and “C” together to a bushing, and then “B” and “D” together to another bushing.
Connect “A” and “D” together to a bushing, then “B” and “C” together to another bushing.
Connect “A” and “C” together to a bushing, and leave “B” and “D” in place.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Harper is working on a project to supply three-phase power from an underground system. Which of these statements about using underground transformers for three-phase service is true?
When supplying three-phase power from underground systems, the transformers used are always single units.
The “Power” pad-mount used in an open bank configuration must have the grounding strap removed from the X2.
Only three-phase pad-mounts may be used.
The banking connections for three-phase units must be done externally.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of these statements regarding Non-Standard Connections is true?
You can get 120/208 from single-phase Delta.
It’s possible to get two 120/208 3-phase services from one Delta-Delta bank.
To complete a three-phase connection, you must ground at the X2 only.
A Delta or Wye can be grounded one time at any coil terminal and still operate properly.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?