
La Sûreté de Fonctionnement - ISO 26262 - System INT & V
Authored by Anthony RONGERE
Professional Development
Professional Development
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
5 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What are the different integration phases at system level?
Integration of all elements of a system
Integration of HW and the SW
Integration of the item within the vehicle
Integration of the HW components
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
It is required to define the verification environment within the system test specification?
Right
Wrong
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In case an ASIL decomposition of a TSR ASIL C, leading to TSRs ASIL A(C) + ASIL B(C), integration activities must be performed in accordance with
ASIL C
ASIL B
ASIL A
4.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Confidence evidence needs to be provided for SW tools used for
SW development
HW development
Item integration tests
Requirements management
5.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Verification activities include
Work product reviews
Testing activities
Analyses
Simulations
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?