Recap (28 November)

Recap (28 November)

12th Grade

9 Qs

quiz-placeholder

Similar activities

Maintenance Techniques Quiz

Maintenance Techniques Quiz

12th Grade

10 Qs

Air Tool Safety and Hydraulic Equipment Quiz

Air Tool Safety and Hydraulic Equipment Quiz

12th Grade

10 Qs

Hydraulics Application Quiz

Hydraulics Application Quiz

12th Grade - University

10 Qs

Hydraulic Control Circuit Quiz

Hydraulic Control Circuit Quiz

12th Grade

10 Qs

Civil Engineering Evaluation Quiz

Civil Engineering Evaluation Quiz

12th Grade

11 Qs

Construction Materials & Testing Quiz

Construction Materials & Testing Quiz

12th Grade

13 Qs

Revision Test 1.4

Revision Test 1.4

12th Grade

13 Qs

Explore the Honda CBR650R

Explore the Honda CBR650R

12th Grade

10 Qs

Recap (28 November)

Recap (28 November)

Assessment

Quiz

Engineering

12th Grade

Medium

Created by

Eman Omairey

Used 1+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which shape is NOT mentioned as a type of culvert?

Round

Arch

Box

Triangle

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a benefit of using culverts?

Economical construction

Reduced need for embankments

Increased traffic speed

Efficient water drainage

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which material is NOT commonly used for making culverts?

Concrete

Corrugated aluminium

Corrugated steel

Wood

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main focus of the cut and cover technique?

Surface decoration

Considerable excavation

Minimal disruption

Aesthetic design

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following was not part of the Stockton Waterfront project?

Retaining walls

CFA piles

Geogrid soil reinforcement

Culvert

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The choice of culvert material depends on (multichoice)

Structural Strength

Hydraulic roughness

Abrasion resistance

Durability

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Hydraulic jacking rig is used in cut and cover culvert construction

True

False

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The preliminary cost of a project is included in the unit rate calculations

True

False

Sometimes

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The following is NOT part of a cost estimate for the contractor

materials

preliminaries

overheads

land cost

machineries and plants