English  I

English I

University

14 Qs

quiz-placeholder

Similar activities

Two Truths and A Lie

Two Truths and A Lie

1st Grade - Professional Development

15 Qs

Choose the Best Word

Choose the Best Word

5th Grade - University

15 Qs

ASVAB 2022-2023: Mechanical Comprehension

ASVAB 2022-2023: Mechanical Comprehension

5th Grade - Professional Development

17 Qs

Eng2.LT2.LA3. Recalling Information

Eng2.LT2.LA3. Recalling Information

University

9 Qs

TES BAHASA INGGRIS (TBI)

TES BAHASA INGGRIS (TBI)

12th Grade - University

10 Qs

EFP #6 Hydrolic Machines and Maglev Trains

EFP #6 Hydrolic Machines and Maglev Trains

University

15 Qs

Latin Greek

Latin Greek

6th Grade - University

15 Qs

Keeping the City of Venice Afloat

Keeping the City of Venice Afloat

8th Grade - University

15 Qs

English  I

English I

Assessment

Quiz

English

University

Medium

Created by

Jeremy Percy Valle

Used 1+ times

FREE Resource

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Media Image

Select the name that corresponds to the image

Paver

Tractor

The loader

Excavator

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Media Image

Select the name that corresponds to the image

Optical levels

Total station

Tripod

Theodolite

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Media Image

Select the name that corresponds to the image

Theodolite

Total station

Tripod

level machine

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Media Image

Select the name that corresponds to the image

Hydraulic tube

Filter

Hydraulic windlass

Anchor

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Media Image

Select the name that corresponds to the image

Battery

Hydraulic Cylinders

Test tube

S.O.V.

6.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

TOTAL STATION

Its use ranges from topographic land surveying and the design of canals and drainage systems, to the monitoring of water levels.

It is used to obtain accurate information about the topography of a piece of land or watershed

They are used in the construction of underground hydraulic infrastructures and in the maintenance of existing infrastructures.

It is used in the operation of gates and valves in hydraulic

infrastructures such as dams, reservoirs, and canals.

It is used to provide accurate information on water flow, allowing water resources to be managed efficiently

7.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

EXCAVATOR

It is used to obtain accurate information about the topography of a piece of land or watershed.

Its use ranges from topographic land surveying and the design canals and drainage systems, to the monitoring of water levels.

They are used in the construction of underground hydraulic infrastructures and in the maintenance of existing infrastructures.

It is used to excavate, move and handle large volumes of earth and materials.

It is used to provide accurate information on water flow, allowing water resources to be managed efficiently.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?