Plumbing Knowledge Quiz

Plumbing Knowledge Quiz

12th Grade

10 Qs

quiz-placeholder

Similar activities

Motor Protection and Sizing Standards

Motor Protection and Sizing Standards

12th Grade

15 Qs

Intro to GMAW

Intro to GMAW

9th - 12th Grade

12 Qs

unit 110 ppt 2 knowlegde check

unit 110 ppt 2 knowlegde check

12th Grade

14 Qs

PPT 3 - Pipework & Circulation COL

PPT 3 - Pipework & Circulation COL

12th Grade - University

15 Qs

307 Central Heating Systems 3 Quiz

307 Central Heating Systems 3 Quiz

2nd Grade - University

10 Qs

Levelling in Surveying Quiz

Levelling in Surveying Quiz

12th Grade

15 Qs

Understanding Listed Buildings and Heritage

Understanding Listed Buildings and Heritage

12th Grade

15 Qs

Construction Industry Trivia Challenge

Construction Industry Trivia Challenge

12th Grade - University

15 Qs

Plumbing Knowledge Quiz

Plumbing Knowledge Quiz

Assessment

Quiz

Construction

12th Grade

Hard

Created by

Mark Dymond

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which information source gives details on who is responsible for cutting holes in walls and floors for pipe work systems?

Construction blueprints

Building codes

Project specifications

Safety manuals

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What item of equipment would you use to provide light in a roof space if no other light source was available?

Flashlight

Candle

Lantern

Headlamp

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who provides a delivery advice note and what is its purpose?

The supplier provides it to confirm delivery details.

The customer provides it to request delivery.

The courier provides it to track the shipment.

The warehouse provides it to manage inventory.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The quantity of materials available for use on site can be found in which document on a building site?

Material Requisition Form

Inventory Report

Site Diary

Bill of Quantities

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What visible sign would alert you to the fact that a gas fire has not been installed correctly or was not operating correctly?

Yellow or orange flame instead of blue

Loud noise from the gas fire

Gas fire turns off automatically

Gas fire does not produce heat

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The required distance between the centres of two elbows in a copper pipeline is 360mm. The X factor of the elbows is 16mm. What length of pipe should be cut to accurately give these centres when the pipe is installed?

328mm

344mm

360mm

376mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the correct course of action to take if you arrive at a job and no dustsheets are in your vehicle? The job is to remove a back boiler and a lot of dust is liable to be produced.

Proceed with the job without dustsheets.

Go back to get dustsheets.

Use available materials to cover the area.

Cancel the job.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?