24-25 SGM #1 - Engineering Design Parameters

Quiz
•
Engineering
•
11th Grade
•
Medium
Standards-aligned
Victor Salinas
Used 7+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
What is the primary purpose of determining design parameters in engineering design?
To ensure the design is aesthetically pleasing
To ensure the design is feasible and manufacturable
To reduce the cost of materials
To increase the complexity of the design
Tags
DOK Level 1: Recall
2.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Which of the following is a design parameter that involves assessing the availability of skilled workers?
Materials
Personnel
Resources
Funding
Tags
DOK Level 1: Recall
3.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Identify a key factor that affects the manufacturability of a product.
The color of the product
The complexity of the design
The marketing strategy
The target audience
Tags
DOK Level 1: Recall
4.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Which design parameter is directly related to the financial aspect of a project?
Time
Resources
Funding
Personnel
Tags
DOK Level 1: Recall
5.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Explain why time is considered a critical design parameter in engineering projects.
It determines the color scheme of the project.
It affects the project completion and delivery schedule.
It influences the choice of materials.
It impacts the number of personnel required.
Tags
DOK Level 2: Skill/Concept
6.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
How does the choice of materials impact the feasibility of an engineering design?
It determines the project's aesthetic appeal.
It affects the durability and cost of the project.
It influences the number of personnel needed.
It impacts the project's marketing strategy.
Tags
DOK Level 2: Skill/Concept
7.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Describe a scenario where resource availability could limit the feasibility of an engineering project.
A project requires a rare material that is not readily available.
A project is completed ahead of schedule.
A project has an unlimited budget.
A project is designed for a small target audience.
Tags
DOK Level 2: Skill/Concept
Create a free account and access millions of resources
Similar Resources on Wayground
22 questions
Engineering Design Process Quiz

Quiz
•
11th Grade
25 questions
3.4.1 - Reverse Engineering

Quiz
•
10th Grade - University
18 questions
Engineering Units of Measurement

Quiz
•
11th Grade
20 questions
PLTW CEA 3.1.6 Commercial Floor Systems

Quiz
•
9th - 12th Grade
25 questions
Ujian Tengah Semester CASR

Quiz
•
10th Grade - University
15 questions
Engineering Design Experience Quiz

Quiz
•
8th Grade - University
19 questions
The Different Roles of Mechanical Engineers and Mechanics

Quiz
•
10th Grade - University
20 questions
Engineering Technology Foundations Sample

Quiz
•
9th - 12th Grade
Popular Resources on Wayground
10 questions
Video Games

Quiz
•
6th - 12th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
10 questions
UPDATED FOREST Kindness 9-22

Lesson
•
9th - 12th Grade
22 questions
Adding Integers

Quiz
•
6th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
20 questions
US Constitution Quiz

Quiz
•
11th Grade
10 questions
Exploring Digital Citizenship Essentials

Interactive video
•
6th - 10th Grade
Discover more resources for Engineering
10 questions
Video Games

Quiz
•
6th - 12th Grade
10 questions
UPDATED FOREST Kindness 9-22

Lesson
•
9th - 12th Grade
20 questions
US Constitution Quiz

Quiz
•
11th Grade
6 questions
Rule of Law

Quiz
•
6th - 12th Grade
15 questions
ACT Math Practice Test

Quiz
•
9th - 12th Grade
18 questions
Hispanic Heritage Month

Quiz
•
KG - 12th Grade
28 questions
Ser vs estar

Quiz
•
9th - 12th Grade
10 questions
Would you rather...

Quiz
•
KG - University