
24-25 SGM #1 - Engineering Design Parameters

Quiz
•
Engineering
•
11th Grade
•
Medium
Standards-aligned
Victor Salinas De Ases
Used 7+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
What is the primary purpose of determining design parameters in engineering design?
To ensure the design is aesthetically pleasing
To ensure the design is feasible and manufacturable
To reduce the cost of materials
To increase the complexity of the design
Tags
DOK Level 1: Recall
2.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Which of the following is a design parameter that involves assessing the availability of skilled workers?
Materials
Personnel
Resources
Funding
Tags
DOK Level 1: Recall
3.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Identify a key factor that affects the manufacturability of a product.
The color of the product
The complexity of the design
The marketing strategy
The target audience
Tags
DOK Level 1: Recall
4.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Which design parameter is directly related to the financial aspect of a project?
Time
Resources
Funding
Personnel
Tags
DOK Level 1: Recall
5.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Explain why time is considered a critical design parameter in engineering projects.
It determines the color scheme of the project.
It affects the project completion and delivery schedule.
It influences the choice of materials.
It impacts the number of personnel required.
Tags
DOK Level 2: Skill/Concept
6.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
How does the choice of materials impact the feasibility of an engineering design?
It determines the project's aesthetic appeal.
It affects the durability and cost of the project.
It influences the number of personnel needed.
It impacts the project's marketing strategy.
Tags
DOK Level 2: Skill/Concept
7.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Describe a scenario where resource availability could limit the feasibility of an engineering project.
A project requires a rare material that is not readily available.
A project is completed ahead of schedule.
A project has an unlimited budget.
A project is designed for a small target audience.
Tags
DOK Level 2: Skill/Concept
Create a free account and access millions of resources
Similar Resources on Quizizz
17 questions
Forces Quiz Practice

Quiz
•
7th Grade - University
20 questions
PLTW EOC Eng Ess Test Review 3

Quiz
•
9th - 12th Grade
15 questions
MESA Machine Contest Quiz

Quiz
•
7th Grade - University
20 questions
1.4.1 - From High School to College: Guide for Future Engineers

Quiz
•
10th Grade - University
20 questions
Computer-Aided Drafting and Modeling

Quiz
•
9th - 12th Grade
15 questions
2.3.4 - NSPE Code of Ethics

Quiz
•
10th Grade - University
21 questions
Yr. 13 Tech. 1.24 Designing Prt. 2

Quiz
•
11th Grade
20 questions
Chilean Bridge Design

Quiz
•
10th Grade - University
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade
Discover more resources for Engineering
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Taxes

Quiz
•
9th - 12th Grade
17 questions
Parts of Speech

Quiz
•
7th - 12th Grade
20 questions
Chapter 3 - Making a Good Impression

Quiz
•
9th - 12th Grade
20 questions
Inequalities Graphing

Quiz
•
9th - 12th Grade
10 questions
Identifying equations

Quiz
•
KG - University