Tower Crane Test NCCCO

Tower Crane Test NCCCO

Professional Development

46 Qs

quiz-placeholder

Similar activities

SEGUNDO SECUNDARIA

SEGUNDO SECUNDARIA

3rd Grade - Professional Development

46 Qs

Chapter 5 (PART I) Securing Hosts and Data

Chapter 5 (PART I) Securing Hosts and Data

Professional Development

47 Qs

đề 1 tud

đề 1 tud

Professional Development

44 Qs

Javascript

Javascript

Professional Development

45 Qs

OLIMPIADA WIEDZY O ŻYWNOŚCI

OLIMPIADA WIEDZY O ŻYWNOŚCI

Professional Development

47 Qs

Final Drive Assemblies

Final Drive Assemblies

Professional Development

50 Qs

Test 1 Analog devices

Test 1 Analog devices

Professional Development

50 Qs

Kontenery plus au 32

Kontenery plus au 32

Professional Development

47 Qs

Tower Crane Test NCCCO

Tower Crane Test NCCCO

Assessment

Quiz

Instructional Technology

Professional Development

Medium

Created by

Waseem Ilyassial

Used 7+ times

FREE Resource

46 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

1) which of the following OSHA regulations govern suspended personnel platforms:

A OSHA 1910.180

B OSHA 1926.1400

C OSHA 1934.2 35

D OSHA 1926.106

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

2) according to ASME B30.3, the prohibited zone for power lines that are 60 kV is:

A 10 feet

B 12 feet

C 15 feet

D 20 feet

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

3) according to ASME B30.3, load hoist rotation resistant wire rope has a design factor of:

A .5 to 1

B 3 to 1

C 3.5 to 1

D 5 to 1

4.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

4) according to ASME B30.3, when lifting a suspended personnel platform the design factor for the rigging hardware is:

A 2 to 1

B 5 to 1

C 7 to 1

D 10 to 1

5.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

5) according to ASME B30.3, load hoist ropes that are not rotation resistant must have a design factor of:

A 2 .5 to 1

B 3 to 1

C 3.5 to 1

D 5 to 1

6.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

6) The OSHA construction standard for rigging equipment is:

A 1925.550

B 1910.180

C 1926.251

D 1910.18

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

7) according to ASME B30.3, under whose recommendations should a preventative maintenance program be set up:

A master mechanic

B crane operator

C company supervisor

D Crane manufactur

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?