Pre UPS 2 2024/2025

Pre UPS 2 2024/2025

University

33 Qs

quiz-placeholder

Similar activities

Parcial Vegetales II

Parcial Vegetales II

University

30 Qs

PLCC

PLCC

University

35 Qs

Ângulos Verticais

Ângulos Verticais

University

38 Qs

Bomb Diffusion - Quiz

Bomb Diffusion - Quiz

University

30 Qs

UNit 1 Properties of Matter

UNit 1 Properties of Matter

University

30 Qs

electrical set b

electrical set b

University

31 Qs

Cement and Its Properties Quiz

Cement and Its Properties Quiz

University

30 Qs

Module 1 (Embedded Systems - Quiz)

Module 1 (Embedded Systems - Quiz)

University

30 Qs

Pre UPS 2 2024/2025

Pre UPS 2 2024/2025

Assessment

Quiz

Engineering

University

Medium

Created by

Hasnina Nazran

Used 6+ times

FREE Resource

33 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the leadership style that can be practised in managing an engineering team? 

 

  1. I. Bureaucratic 

  1. II. Systematic 

  1. III. Laissez-Faire 

I and II

II and III

I and III

I, II and III

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Refer to the statement below. 

 

A bar graph that ranks data classification in descending order from left to right, which categorised the vital few and useful many data. 

 

Determine the type of quality control tool referred to in this statement. 

Bar chart

Histogram

Pareto Diagram

Check Sheet

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Figure shows a shape symbol that is frequently used in a typical flowchart. Determine the conventional meaning of this symbol. 

Starting or ending point of a flowchart. 

Printout, such as document or report. 

Decision or branching point. 

Information entering or leaving the system. 

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Just in Time (JIT) is a Total Quality Management (TQM) method to reduce waste and improve workflow. Determine the advantages of JIT in improving the work process. 

 

  1. I. Reduce required storage space. 

  1. II. Less likelihood of stock perishing. 

  1. III. More working capital. 

I and II

II and III

I and III

I, II and III

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The functions of project planning in any engineering project include 

 

  1. I. Ensure all tasks are carefully considered and anticipated. 

  1. II. Provide a basis for monitoring performance of the project. 

  1. III. Encourage better communication with stakeholders. 

I and II

II and III

I and III

I, II and III

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Figure above shows a method for planning a project. Determine the name of this method. 

  1. Critical Path Method 

PERT

Gantt Chart

5W + 1H

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Safety and health are very important in any engineering project. Identify the responsible organization for the administration and enforcement of legislation related to occupational safety and health in Malaysia. 

National Institute of Occupational Safety and Health.

Department of Occupational Safety and Health

Ministry of Health. 

Fire and Rescue Department Malaysia. 

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?