Procedure Text For TKP

Procedure Text For TKP

10th Grade

10 Qs

quiz-placeholder

Similar activities

BEGINNING A SENTENCE

BEGINNING A SENTENCE

10th Grade - Professional Development

10 Qs

IT'S ALL IN THE CHEMISTRY!

IT'S ALL IN THE CHEMISTRY!

10th Grade

10 Qs

Reading Comprehension: Tetris

Reading Comprehension: Tetris

10th Grade

10 Qs

LESSON 5: CREATING ART WITH CODE

LESSON 5: CREATING ART WITH CODE

7th Grade - University

11 Qs

U.S. PUBLIC TRANSPORT

U.S. PUBLIC TRANSPORT

5th - 12th Grade

10 Qs

Capitalization

Capitalization

8th Grade - University

10 Qs

Minecraft

Minecraft

8th Grade - University

10 Qs

Gold Experience B2 unit 3 vocabulary from the reading

Gold Experience B2 unit 3 vocabulary from the reading

9th - 12th Grade

15 Qs

Procedure Text For TKP

Procedure Text For TKP

Assessment

Passage

English

10th Grade

Hard

Created by

Istain Istain

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the main materials needed for making paving blocks?

Cement, Water, Aggregates, Mold

Aggregates, Mold, Shovel, Measuring tools

Cement, Sand, Water, Aggregates

Sand, Water, Vibrating table, Trowel

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of applying a mold release agent to the mold?

To speed up the curing process

To color the paving blocks

To increase the strength of the blocks

To prevent the concrete from sticking

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to keep the paving blocks moist for at least 24 hours?

To prevent rapid drying and cracking

To make them easier to demold

To make them harder

To speed up the curing process

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of curing the paving blocks in a shaded area for several days?

To prevent them from gaining strength

To speed up the installation process

To make them more colorful

To allow them to gain strength

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is consistency of the concrete mixture crucial for the quality of the paving blocks?

To make them smell better

To speed up the demolding process

To result in stronger and more durable blocks

To ensure they are lightweight

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does proper compaction of the concrete mixture ensure?

It makes the blocks more colorful

It removes air bubbles and ensures a dense, strong paving block

It speeds up the curing process

It makes the blocks easier to store

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is adequate curing essential for the strength and durability of the paving blocks?

To speed up the mixing process

To prevent them from being stored

To make them more lightweight

To ensure they reach their full strength

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?