Construction Site Preparation Quiz

Construction Site Preparation Quiz

12th Grade

18 Qs

quiz-placeholder

Similar activities

Psychology and Consumerism Quiz

Psychology and Consumerism Quiz

12th Grade

20 Qs

rtw43fzxs51.70

rtw43fzxs51.70

12th Grade

20 Qs

CPA JYSS 2018 MYE Paper 1

CPA JYSS 2018 MYE Paper 1

6th Grade - Professional Development

20 Qs

Carpentry 1 Hand and Power Tools

Carpentry 1 Hand and Power Tools

9th - 12th Grade

15 Qs

CAMBRIDGE - A Level - IT - Network Security

CAMBRIDGE - A Level - IT - Network Security

12th Grade - Professional Development

15 Qs

NCF Revision (Chap 9)

NCF Revision (Chap 9)

1st - 12th Grade

20 Qs

Construction Site Preparation Quiz

Construction Site Preparation Quiz

Assessment

Quiz

Professional Development

12th Grade

Medium

Created by

Richard Abbotts

Used 1+ times

FREE Resource

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in preparing the construction site?

Installing roof structure

Setting out the structure position

Plaster board/dry line

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process called that involves creating the base of the construction?

Lay building foundations

Test and commissioning

Fitting kitchen cupboards

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which stage are the walls constructed up to the roof level?

Plaster board/dry line

Brick walls to roof line

Installing roof structure

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is the framework for the roof installed?

Setting out the structure position

Installing roof structure

Lay building foundations

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During which stage is the interior lining like plasterboard added?

Plaster board/dry line

Fitting kitchen cupboards

Test and commissioning

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When are the kitchen cupboards installed?

Plaster board/dry line

Fitting kitchen cupboards

Test and commissioning

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens during the final stage of the construction process to ensure everything is functioning correctly?

Installing roof structure

Test and commissioning

Lay building foundations

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?