Plumbing level 2 -  PP1.1 Central Heating

Plumbing level 2 - PP1.1 Central Heating

University

10 Qs

quiz-placeholder

Similar activities

L2 Common Plumbing Processes PT1

L2 Common Plumbing Processes PT1

University - Professional Development

10 Qs

NCCER 02111 DWV 4.0 Quiz

NCCER 02111 DWV 4.0 Quiz

University

14 Qs

Chapter 3 Vocab Review

Chapter 3 Vocab Review

University

15 Qs

Week 7

Week 7

University

10 Qs

HVAC/R - (Heating. Ventilation and Refrigeration)

HVAC/R - (Heating. Ventilation and Refrigeration)

11th Grade - University

10 Qs

NFPA 25 5.4 review quiz

NFPA 25 5.4 review quiz

University

15 Qs

Quiz 1 - Water Supply1

Quiz 1 - Water Supply1

University

10 Qs

Plumbing level 2 -  PP1.1 Central Heating

Plumbing level 2 - PP1.1 Central Heating

Assessment

Quiz

Professional Development

University

Medium

Created by

Byron Morris

Used 29+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of central heating?

To provide thermal comfort within a property

To increase property value

To improve air quality

To reduce electricity consumption

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which system allows all rooms in a property to be heated at the same time to a specific temperature?

Background central heating

Pumped central heating

Selective central heating

Full central heating

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of system is fed from a feed and expansion cistern located at high level?

Fully pumped systems

Low pressure, open vented systems

Gravity hot water system

Sealed, pressurised systems

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT compliant with Building Regulations part L?

Fully pumped systems

C plan two pipe semi gravity

Two pipe semi gravity

One pipe gravity system

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a drawback of a one pipe gravity system?

Requires a large boiler

Each radiator progressively cools down

Expensive to install

Difficult to maintain

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which system uses a three port mid-position valve?

Fully pumped two, two port valves – S plan system

One pipe gravity system

Fully pumped mid-position valve – Y plan system

Two pipe semi gravity with heat sink

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main cause of corrosion within a central heating system?

High water pressure

Aeration

Low water temperature

Excessive use of inhibitors

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?