Plumbing level 2 - PP1- Central Heating

Plumbing level 2 - PP1- Central Heating

University

10 Qs

quiz-placeholder

Similar activities

SOCHi A&P Chapter 15

SOCHi A&P Chapter 15

University

10 Qs

Business English

Business English

University - Professional Development

10 Qs

SOCHi CPT Chapter 4

SOCHi CPT Chapter 4

University

13 Qs

Resume Facts!

Resume Facts!

12th Grade - University

10 Qs

Week 6 Basic Automotive Maintenance

Week 6 Basic Automotive Maintenance

University

9 Qs

GI, Endo & Neuro Part I

GI, Endo & Neuro Part I

University

7 Qs

Principles of Heating and Air Conditioning

Principles of Heating and Air Conditioning

8th Grade - University

10 Qs

Lean

Lean

1st Grade - University

14 Qs

Plumbing level 2 - PP1- Central Heating

Plumbing level 2 - PP1- Central Heating

Assessment

Quiz

Professional Development

University

Medium

Created by

Byron Morris

Used 22+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done before starting soundness testing?

Attach the hydraulic test bucket

Check for leaks

Walk around the system to make sure all joints have been made

Fill the system with water

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in soundness testing for rigid pipes?

Slowly fill the system with water

Leave for one hour

Check for any pressure drop

Pump system up to 1.5 times the working pressure

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For plastic pipes, what is the initial pressure to which the system should be pumped?

3 bar

1.5 times working pressure

1 bar

2 bar

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long should the system be left to stand for temperature stabilization in rigid pipe testing?

45 minutes

30 minutes

1 hour

15 minutes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done after filling the system with water in plastic pipe testing?

Check for leaks

Attach the hydraulic test bucket

Increase pressure to 1.5 times working pressure

Reduce pressure to one-third

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is added to the system for disinfecting according to BS6700?

Detergent

Antifreeze

Hydraulic fluid

Sodium hypochlorite solution or chlorine

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done after adding disinfectant to the system?

Leave for 15 minutes

Leave for 1 hour

Leave for 30 minutes

Leave for 45 minutes

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?