Plumbing level 2 - PP1- Hot water

Plumbing level 2 - PP1- Hot water

University

10 Qs

quiz-placeholder

Similar activities

In the kitchen...

In the kitchen...

University - Professional Development

15 Qs

Lean for Everyone - DOWNTIME (Post Test)

Lean for Everyone - DOWNTIME (Post Test)

University - Professional Development

10 Qs

Disney Trivia

Disney Trivia

KG - Professional Development

15 Qs

Proffessional Ethics

Proffessional Ethics

10th Grade - University

10 Qs

EEE610 EE2427B&E

EEE610 EE2427B&E

University

10 Qs

PEC101 Brain Teasers

PEC101 Brain Teasers

University

15 Qs

PMP - Time

PMP - Time

University

10 Qs

Role of Government

Role of Government

KG - University

10 Qs

Plumbing level 2 - PP1- Hot water

Plumbing level 2 - PP1- Hot water

Assessment

Quiz

Professional Development

University

Easy

Created by

Byron Morris

Used 87+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does WRAS stand for?

Water Regulation and Standards Scheme

Water Regulation and Safety Scheme

Water Regulation Association Scheme

Water Regulation Advisory Scheme

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which British Standard covers the design, installation, testing, and maintenance of water systems?

BS8000 pt15

BS6700

BS9999

BS1234

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size of the vent pipe according to BS6700?

32mm

28mm

22mm

15mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a centralised instantaneous hot water system, what is commonly used to heat the water?

Immersion heater

Combination boiler

Solar panels

Electric heater

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the open vent in an open vented system?

To increase water pressure

To act as a safety relief valve

To filter impurities

To regulate temperature

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size of the CWSC if it feeds both hot and cold water systems?

200 litres

150 litres

115 litres

230 litres

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a direct hot water cylinder using a boiler, what is absent in the cylinder?

Vent pipe

Hot distribution pipe

Heat exchanger coil

Cold feed pipe

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?