1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a form of non-verbal communication?
Signage
Telephone
Two-way radio
On-site meeting
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main use of a sliding bevel?
To determine plumb
To determine a level surface
To transfer angles and draw lines
To measure the diameter of a circle
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What term is used to indicate land height on site plans?
Datum
Contours
Land referencing
Orientation of structures
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In the construction industry, which type of plan indicates the position of doors and windows?
Construction
Project
Detail
Site
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first safety control measure for a risk?
Work safely
Eliminate the risk
Substitute the equipment
Use Personal Protection Equipment (PPE)
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What would be shown on an electrical safety inspection tag placed on an electric drill?
Manufacture date of the drill
Indication of the safe operating voltage of the drill
Licence number of inspector and date of inspection
Identification of correct storage procedures for the drill
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is it important for an apprentice to have an understanding of recognition of prior learning (RPL)?
To ensure site safety
To gain a white card
To qualify for a first aid certificate
To provide evidence of qualifications
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?